Permit: T09BU00522
Permit Details
Apply Date:
04/09/2009
Applicant:
ALVERNON LEE PARTNERS LLC
Description:
GRADING:
Contractors:
- MIRAMONTE ARIZONA L L C *C
Permit Reviews
Permit Number - T09BU00522
Permit Status: Final
Permit Description: GRADING:
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/12/2010 | GRADING | 03/08/2010 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T09BU00522
Permit Description: GRADING:
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/11/2009 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | |
07/22/2009 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE PERIMETER OF THE SITE. 1) INSTALL STABILIZED ENTRANCE/EXIT AT ALL POINTS OF ENTRY TO SITE IN ORDER TO REDUCE TRACKING OF SOIL ON PUBLIC ROADWAYS. 2) INSTALL CONCRETE/MATERIALS WASH WHEN APPLICABLE. 3) POST A COPY OF YOUR SIGNED NOI ON SITE. 4) SWEEP UP TRACKED SOIL OFF OF ROADS ROUTINELY. 5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP CALL FOR ANY CONCERNS OR QUESTIONS. |
07/22/2009 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1) INSTALL STABILIZED ENTRANCE/EXIT AT ALL POINTS OF ENTRY TO SITE IN ORDER TO REDUCE TRACKING OF SOIL ON PUBLIC ROADWAYS. 2) INSTALL CONCRETE/MATERIALS WASH WHEN APPLICABLE. 3) POST A COPY OF YOUR SIGNED NOI ON SITE. 4) SWEEP UP TRACKED SOIL OFF OF ROADS ROUTINELY. 5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP CALL FOR ANY CONCERNS OR QUESTIONS. |
12/14/2009 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | ACCESSIBLE ROUTE OFF OF PIMA, RUN SLOPE MUST BE LESS THAN 5% OR ROUTE MUST COMPLY W/ HC RAMP REQUIREMENTS. SLOPE ALONG RIGHT OF WAY MUST BE STABILIZED. STORM WATER CONCERNS OK |
12/18/2009 | GRADING - INTERMEDIATE | MRUSSO | Approved | SPOKE W/ COMTRACTOR, ENGINEER, AND DEVELOPER ON REQUIREMENTS FOR A COF O FOR ENG APPROVAL FOR THE SINGLE DEVELOPED LOT. ALSO DISCUSSED ADAAG REQUIRED ACCESS OFF OF PIMA |
09/08/2011 | GRADING - FINAL | MRUSSO | Approved | NO CHANGES, PERMIT EXTENSION. NO STORM WATER CONCERNS AT THIS TIME |
06/03/2020 | LANDSCAPE INSPECTION | JV | Approved | |
06/03/2020 | NPPO - FINAL | JV | Approved | |
06/03/2020 | GRADING - REBAR | JV | Approved | |
06/03/2020 | GRADING - TIER REV | JV | Approved |