Permit Details

Status:
Final
Type:
Grading and SWPPP
Apply Date:
03/26/2009
Applicant:
PERMIT RESOURCE SERVICES
Description:
GRADING FOR NEW STORAGE FACILITY
Contractors:
  • FAST FAB ERECTORS INC ,

Permit Reviews

Permit Number - T09BU00442
Permit Status: Final
Permit Description: GRADING FOR NEW STORAGE FACILITY
Start Date Submittal Complete Date Status  
03/26/2009 PLANS OK TO SUBMIT - GRADING 03/26/2009 COMPLETED Review Details
03/30/2009 GRADING 06/29/2009 COMPLETED Review Details
03/30/2009 SWPPP 04/10/2009 COMPLETED Review Details
06/29/2009 RESUBMITTAL - GRADING ALL 07/23/2009 COMPLETED Review Details
06/29/2009 RESUBMITTAL - SWPPP 06/30/2009 COMPLETED Review Details
07/23/2009 RESUBMITTAL - GRADING ALL 08/20/2009 COMPLETED Review Details
07/23/2009 RESUBMITTAL - SWPPP 07/24/2009 COMPLETED Review Details
09/02/2009 RESUBMITTAL - GRADING ALL 09/16/2009 COMPLETED Review Details
09/02/2009 RESUBMITTAL - SWPPP 09/14/2009 COMPLETED Review Details
09/17/2009 RESUBMITTAL - GRADING ALL 10/02/2009 COMPLETED Review Details
10/02/2009 RESUBMITTAL - GRADING 10/05/2009 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T09BU00442
Permit Status: Final
Permit Description: GRADING FOR NEW STORAGE FACILITY
Total Outstanding Activity Conditions - 1
Date Name
03/26/2009 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T09BU00442
Permit Description: GRADING FOR NEW STORAGE FACILITY
Total Completed Inspections - 11
Date Description Inspector Results Comments
10/06/2009 NPPO PRE PERMIT INSPECTION JLINVILL Approved SEE NPP MONITORING REPORT.
10/15/2009 GRADING - CHECK FOR ACTIVITY DROBERTS Approved THE AREA HAS BEEN GENERALLY CLEANED UP AT THIS TIME AND IS READY FOR THE WORK TO BE STARTED. THE PERMIT HAS BEEN APPROVED WITHIN THE PAST WEEK, A PRE-COM MEETING NEEDS TO BE SCHEDULED PRIOR TO WORK STARTING ON THIS SITE.
11/30/2009 GRADING - INTERMEDIATE DROBERTS Approved MET WITH THE OWNER TO DISCUSS THE WORK THAT HE HAS GOING ONSITE AT THIS TIME. HE IS CURRENTLY STARTING TO FORM FOR THE OFFICE FLOOR SLABS, HAS ROUGH CUT ALL OF THE GRADING AND THE DETENTION/RETENTION BASINS, AND IS STARTING PLACING THE CHAINLINK FENCE ALONG OLD VAIL ROAD. HE HAS ASKED TO MODIFY SOME OF THE CHAINLINK FENCE AREAS, AND WOULD LIKE TO PLACE GUARDRAIL ADJACENT TO THE EXISTING SUBDIVISION WALL. I WILL CHECK ON THE CHANGES WITH THE ENGINEERING AND ZONING SECTIONS AND ADVISE HIM OF WHAT HE MAY HAVE TO DO TO BEABLE TO MAKE THE MODIFICATIONS THAT HE HAS TALKED ABOUT.
12/11/2009 GRADING - REBAR DROBERTS Approved MET THE CONTRACTOR ON SITE AND LOOKED AT THE REBAR PLACEMENT FOR THE TRASH DUMPSTER ENCLOSURE. THERE ALSO HAVE BEEN QUESTIONS RAISED IN REGARDS TO THE DETENTION RETENTION BASINS WEIR OUTLET LOCATIONS AS WELL AS THE PLACEMENT OF THE ACCESS RAMPS INTO THE BASINS. THESE QUESTIONS WILL BE ADDRESSED TO JASON FOR HIS INTERPRETATION SINCE PORTIONS OF THE INFORMATION HAS NOT BEEN DEPICTED ON THE APPROVED PLANS.
04/01/2010 STORMWATER INSTALL OF CONTROLS DROBERTS Approved
04/15/2010 STORMWATER FINAL INSPECTION DROBERTS Approved FINAL NOT TO BE DONE ON THIS ITEM TILL ALL OF THE LANDSCAPING ISSUES HAVE BEEN ADDRESSED AND THE FINAL GRADING INSPECTION IS APPROVED.
04/15/2010 STORMWATER FOLLOW-UP INSP DROBERTS Approved
04/15/2010 ENGINEERING PRE-CONSTRUCTION DROBERTS Approved
04/19/2010 LANDSCAPE INSPECTION DROBERTS Approved SITE WAS CHECKED AND APPEARED TO BE COMPLETE AT THIS TIME. A FEW MINOR PLANTS WILL BE REPLACED AND RECHECKED PRIOR TO THE CLEARING OF BUILDING #7 T08CM00595.
04/19/2010 GRADING - TIER REV DROBERTS Approved LOOKED OVER THE SITE AFTER THE LANDSCAPE WORK HAS BEEN COMPLETED, I WILL BE COUNTING THE PLANTS DURING THE LANDSCAPING INSPECTION ON 4/20/2010. THE SITE APPEARS TO BE COMPLETE AT THIS TIME, BUT I HAVE NOTED A FEW PLANTS THAT APPEAR TO BE NON VIABLE DURING MY WALK THROUGH OF THE EAST BASIN.
08/30/2010 GRADING - FINAL DROBERTS Approved GRADES OF THE CHANNEL ADJACENT TO OLDVAIL ROAD HAVE NOT BEEN CUT TO THE PROPER DEPTH. THIS WORK NEEDS TO BE COMPLETED TO ENSURE PROPER DRAINAGE IS ALLOWED FROM THE NORTHSIDE OF THE SITE TO THE SOUTHSIDE OF THE SITE.

Documents

File Name Document Type  
None IMAGES VIEW
001_SD0.TIF GRADING PLANS VIEW
002_SD1.TIF GRADING PLANS VIEW
003_SD1.1.TIF GRADING PLANS VIEW
004_SD2.TIF GRADING PLANS VIEW
005_SD2.1.TIF GRADING PLANS VIEW
006_SD2.2.TIF GRADING PLANS VIEW
007_SD4.TIF GRADING PLANS VIEW
008_SD5.TIF GRADING PLANS VIEW
009_SD6.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW