Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T08CM03225
Permit Details
Apply Date:
09/29/2008
Applicant:
N/A
Description:
SITE ONLY R1 CHANGE ELECTRICAL SERVICE TO U/G AT UNIT 2 AND HCS CONNECTION POINT
Contractors:
- QUATROVEST INC
Permit Reviews
Permit Number - T08CM03225
Permit Status: Final
Permit Description: SITE ONLY
R1 CHANGE ELECTRICAL SERVICE TO U/G AT UNIT 2 AND HCS CONNECTION POINT
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/06/2009 | RESUBMITTAL - SITE | 01/15/2009 | COMPLETED |
01/28/2009 | REVISION - SITE | 01/28/2009 | COMPLETED |
03/16/2010 | REVISION - SITE | 03/16/2010 | COMPLETED |
09/29/2008 | SITE | 10/01/2008 | COMPLETED |
10/01/2008 | SITE | 10/30/2008 | COMPLETED |
10/30/2008 | RESUBMITTAL - SITE ALL | 11/21/2008 | COMPLETED |
12/03/2008 | RESUBMITTAL - SITE ALL | 01/06/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08CM03225
Permit Status: Final
Permit Description: SITE ONLY
R1 CHANGE ELECTRICAL SERVICE TO U/G AT UNIT 2 AND HCS CONNECTION POINT
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/29/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T08CM03225
Permit Description: SITE ONLY
R1 CHANGE ELECTRICAL SERVICE TO U/G AT UNIT 2 AND HCS CONNECTION POINT
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/26/2009 | FIRE SPKLR - FINAL | RMYERS | Approved | IVRS - Inspection :* |
01/26/2009 | FIRE SPKLR - UG, PIPING, HYDRO | RMYERS | Approved | IVRS - Inspection :* |
12/08/2009 | LANDSCAPE - FINAL | PETERMC | Approved | |
12/08/2009 | ENGINEERING - FINAL | MRUSSO | Approved | SITE HAS ALREADY BEEN OCCUPIED PRIOR TO RECEIVING AN INSPECTION REQUEST. THE FOLLOWING SITE ITEMS MUST BE ADDRESSED PRIOR TO APPROVAL BY ENGINEERING: 1) PROVIDE A COPY OF DSMR 2-08.5.1A; DSMR-DS-08-60; AND DSMR 2-08.3.0 FOR INSPECTION AND FOR OUR RECORDS. 2) INSTALL ALL 6" DEPRESSED WATER HARVESTING AREAS SHOWN ON YOUR APPROVED PLANS. 3) ADDITIONAL SIDEWALK SCUPPERS WERE INSTALLED ALONG SOUTH AND EAST ACCESS POINTS NOT SHOWN ON THE APPROVED PLANS. 4) MAIN ACCESS ENTRANCE DRIVEWAY WAS NOT CONSTRUCTED PER THE APPROVED PLANS. 5) ROCK RIP RAP AREAS ALONG NORTH SIDE OF PROJECT WAS NOT CONSTRUCTED PER THE APPROVED PLANS - AREAS NEED TO MEET DIMENSIONS SHOWN ON THE PLANS AND INSTALL FILTER FABRIC UNDERNEATH ROCK. 6) NORTH PERIMETER FENCE MUST BE ELEVATED TO ALLOW FOR STORM WATER SITE DRAINAGE UNDER IT, SEE NOTE #6. 7) INSTALL VERTICAL CURBING WHERE SHOWN ON APPROVED PLANS - EXTRUDED CURBING WAS INSTALLED. |