Permit Details

Status:
Withdrwn
Type:
COMMERCIAL OTHER
Address NEW:
1447 E BLACKLIDGE DR
Apply Date:
08/19/2008
Applicant:
N/A
Description:
SITE ONLY

Permit Reviews

Permit Number - T08CM02820
Permit Status: Withdrwn
Permit Description: SITE ONLY
Start Date Submittal Complete Date Status  
08/19/2008 PLANS OK TO SUBMIT - SITE 08/19/2008 COMPLETED Review Details
08/19/2008 SITE 09/24/2008 COMPLETED Review Details
11/03/2008 RESUBMITTAL - SITE ALL 11/26/2008 COMPLETED Review Details
12/01/2008 RESUBMITTAL - SITE 01/13/2009 ACTIVE Review Details

Outstanding Activity Conditions

Permit Number - T08CM02820
Permit Status: Withdrwn
Permit Description: SITE ONLY
Total Outstanding Activity Conditions - 2
Date Name
08/19/2008 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
01/28/2009 The following 11 conditions apply to grading permit T08BU02021: 1) Call for DSD Engineering Inspection meetings. For a DSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2) A copy of the approved Grading Plans and Permits shall be kept at the site at all times, until final grading approval. 3) Interim erosion and sediment controls may be needed at limits of disturbance and placed per Engineer of Record within boundary limits and shall be maintained throughout the life of the project. 4) There shall be no disturbance outside of project boundary without right of way use permits or construction easements for offsite work. 5) Separate building permit applications are required for any walls. 6) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required. 7) Prior to request for final inspection approval, any outstanding fees shall be paid. 8) Prior to request for final grading inspection approval, all permanent erosion control improvements shall be installed and accepted by DSD including rock / established revegetation for all disturbed areas if not improved as per approved plan. 9) The permitee shall notify the DSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. 10) Engineer of Record should be consulted for any revisions to plans. Proposed revisions to design have been discussed with Division Administrator and Civil Engineer at City of Tucson Development Services Department Engineering Division. Prior to final grading inspection, as-built submittal is required for review and approval prior to final project approval. As-built package shall include 2 copies of the as-built grading plan sheets with any additional details, calculations, drainage statement, post construction percolation testing, showing additional scuppers at sidewalk locations, revised location of wall or drainage outlet locations or any other adjustments of drainage improvements and elevations, to assure positive drainage, no adverse impact to neighboring parcels, and infiltration rate no longer than 24 hours. 11) Letters of certification from Engineer of Record and Geotechnical/Soils Engineer are required along with field observation and testing reports, at final grading inspection stage. Letters of certification from Engineer of Record for project substantial completion of project and As-built Grading Plans are required per DS Sec.11-01.16, and shall be submitted prior to final grading inspection.

Outstanding Inspections

Permit Status: Withdrwn
Permit Number: T08CM02820
Permite Description: SITE ONLY
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
FIRE SPKLR - UG, PIPING, HYDRO N/A Not Inspected
FIRE SPKLR - UG PIPING FLUSH N/A Not Inspected
FIRE SPKLR - OH PIPING & HYDRO N/A Not Inspected
FIRE SPKLR - FINAL N/A Not Inspected
LANDSCAPE - FINAL N/A Not Inspected
NPPO - FINAL N/A Not Inspected