Permit: T08BU02091
Permit Details
Apply Date:
12/01/2008
Applicant:
WALLY GASSER
Description:
GRADING: 4th and Sahuaro Residences Grading
Contractors:
- QUATROVEST INC
Permit Reviews
Permit Number - T08BU02091
Permit Status: Final
Permit Description: GRADING: 4th and Sahuaro Residences Grading
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/06/2009 | RESUBMITTAL - GRADING ALL | 02/11/2010 | COMPLETED |
02/11/2010 | REVISION - GRADING | 02/11/2010 | COMPLETED |
02/11/2010 | RESUBMITTAL - GRADING ALL | 03/11/2010 | COMPLETED |
03/16/2010 | REVISION - GRADING | 03/16/2010 | COMPLETED |
12/01/2008 | PLANS OK TO SUBMIT - GRADING | 12/02/2008 | COMPLETED |
12/02/2008 | GRADING | 12/31/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08BU02091
Permit Status: Final
Permit Description: GRADING: 4th and Sahuaro Residences Grading
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/01/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T08BU02091
Permit Description: GRADING: 4th and Sahuaro Residences Grading
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/08/2009 | LANDSCAPE INSPECTION | PETERMC | Approved | |
12/08/2009 | GRADING - INTERMEDIATE | MRUSSO | Approved | SITE HAS BEEN BUILT AND OCCUPIED PRIOR TO BEING NOTIFIED FOR INSPECTION BY CONTRACTOR. |
12/08/2009 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | SITE HAS BEEN BUILT AND OCCUPIED PRIOR TO BEING NOTIFIED FOR INSPECTION BY CONTRACTOR. |
12/08/2009 | GRADING - REBAR | MRUSSO | Approved | SITE HAS BEEN BUILT AND OCCUPIED PRIOR TO BEING NOTIFIED FOR INSPECTION BY CONTRACTOR. |
12/08/2009 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | SITE HAS BEEN BUILT AND OCCUPIED PRIOR TO BEING NOTIFIED FOR INSPECTION BY CONTRACTOR. |
12/08/2009 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | SITE HAS BEEN BUILT AND OCCUPIED PRIOR TO BEING NOTIFIED FOR INSPECTION BY CONTRACTOR. |
12/08/2009 | GRADING - FINAL | MRUSSO | Approved | 1) PROVIDE A COPY OF DSMR 2-08.5.1A; DSMR-DS-08-60; AND DSMR 2-08.3.0 FOR INSPECTION AND FOR OUR RECORDS. 2) INSTALL ALL 6" DEPRESSED WATER HARVESTING AREAS SHOWN ON YOUR APPROVED PLANS. 3) ADDITIONAL SIDEWALK SCUPPERS WERE INSTALLED ALONG SOUTH AND EAST ACCESS POINTS NOT SHOWN ON THE APPROVED PLANS. 4) MAIN ACCESS ENTRANCE DRIVEWAY WAS NOT CONSTRUCTED PER THE APPROVED PLANS. 5) ROCK RIP RAP AREAS ALONG NORTH SIDE OF PROJECT WAS NOT CONSTRUCTED PER THE APPROVED PLANS - AREAS NEED TO MEET DIMENSIONS SHOWN ON THE PLANS AND INSTALL FILTER FABRIC UNDERNEATH ROCK. 6) NORTH PERIMETER FENCE MUST BE ELEVATED TO ALLOW FOR STORM WATER SITE DRAINAGE UNDER IT, SEE NOTE #6. 7) INSTALL VERTICAL CURBING WHERE SHOWN ON APPROVED PLANS - EXTRUDED CURBING WAS INSTALLED. |