Permit: T08BU01082
Permit Details
Apply Date:
06/11/2008
Applicant:
LA CAUSA CONSTRUCTION L L C
Description:
GRADING:
Contractors:
- LA CAUSA CONSTRUCTION L L C
Permit Reviews
Permit Number - T08BU01082
Permit Status: Expired
Permit Description: GRADING:
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/11/2008 | PLANS OK TO SUBMIT - GRADING | 06/16/2008 | COMPLETED |
06/25/2008 | GRADING | 08/06/2008 | COMPLETED |
08/20/2008 | RESUBMITTAL - GRADING | 08/28/2008 | COMPLETED |
08/28/2008 | RESUBMITTAL - GRADING | 10/14/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08BU01082
Permit Status: Expired
Permit Description: GRADING:
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/11/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T08BU01082
Permite Description: GRADING:
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
LANDSCAPE INSPECTION | N/A | Not Inspected | ||
GRADING - CHECK FOR ACTIVITY | N/A | Not Inspected | ||
GRADING - INTERMEDIATE | N/A | Not Inspected | ||
GRADING - FINAL | N/A | Not Inspected | ||
12/16/2008 | STORMWATER FOLLOW-UP INSP | N/A | Partial Approval | NO STORM WATER CONCERNS AT THIS TIME |
Completed Inspections
Permit Status: Expired
Permit Number: T08BU01082
Permit Description: GRADING:
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/11/2008 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | PERFORMED PRE-CON MEETING, DISCUSSED SWPPP WITH SUPERINTENDENT. CHANGES MADE TO SWPPP INCLUDE NOT INSTALLING SEDIMENT CONTROLS ALONG THE FRONT OF THE PROPERTY AND USING SILT SOCK IN PLACE OF SILT FENCE. CONTRACTOR MUST PERFORM ROUTINE STORM WATER MAINT. INSPECTION PER THE APPROVED SWPPP. |
10/01/2008 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | SEDIMENT CONTROLS HAVE BEEN INSTALLED PER PLAN. PROVIDE A DESIGNATED CONCRETE WASH OUT WHEN APPLICABLE. CONTINUE TO SWEEP UP TRACKED MATERIAL AS NEEDED. |