Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T08BU01082
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Continued
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2009 | STORMWATER FOLLOW-UP INSP | Continued | PREP FOR PAVING ON FRIDAY OF THIS WEEK. PERIMETER SEDIMENT CONTROLS REMOVED, ALL CURBING HAS BEEN INSTALLED - CONTINUE TO SWEEP PUBLIC ROAD UNTIL PAVING COMPLETED. NO OTHER SIGNIFICANT STORM WATER CONCERNS |
|
06/24/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. CONTRACTOR WORKING ON ROW, MUST ENSURE SPOILS AND TRACKED SOIL ARE BROUGHT BACK ONTO SITE. | |
06/03/2009 | STORMWATER FOLLOW-UP INSP | Continued | PERIMETER CURBING HAS BEEN INSTALLED. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. CONTINUE TO RE-ESTABLISH YOUR ROCK ENTRANCE AS NEEDED. SWEEP TRACKING PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS |
|
05/18/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-ESTABLISH C0NSTRUCTION ENTRANCE 2) INSTALL A DESIGNATED CONCRETE/MATERIALS WASH-OUT 3) MAINTAIN SEDIMENT CONTROLS ALONG THE PERIMETER THROUGHOUT THE PROJECT. NON-COMPLIANCE COULD RESULT IN A STOP WORK ORDER JOE 349-2423 |
|
04/13/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
03/18/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
01/13/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | 1)RE-ESTABLISH STABILIZED (ROCK) CONSTRUCTION ENTRANCE. 2) ENSURE STORM WATER SELF INSPECTIONS ARE ACCOMPLISHED PER YOUR SWPPP AND ARE DOCUMENTED. 3) CONTINUE TO MAINTAIN SEDIMENT CONTROLS UNTIL THE SITE IS STABILIZED. 4) CONTINUE TO SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS. 5) INSTALL CONCRETE WASH-OUT WHEN APPLICABLE |
|
12/16/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORM WATER CONCERNS AT THIS TIME | |
11/26/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
11/26/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | ENSURE SW SELF INSPECTIONS ARE COMPLETED AND DOCUMENTED PER YOUR SWPPP. SWEEP UP ANY TRACKING OFF OF PUBLIC ROADWAYS. MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE PROJECT. |