Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
251 S WILMOT RD
Apply Date:
02/08/2008
Applicant:
PSOMAS
Description:
GRADING:
Contractors:
  • TROON CONSTRUCTION L L C

Permit Reviews

Permit Number - T08BU00251
Permit Status: Final
Permit Description: GRADING:
Start Date Submittal Complete Date Status  
01/27/2009 RESUBMITTAL - GRADING ALL 02/02/2009 COMPLETED Review Details
02/08/2008 PLANS OK TO SUBMIT - GRADING 02/08/2008 COMPLETED Review Details
02/08/2008 GRADING 04/22/2008 COMPLETED Review Details
04/22/2008 RESUBMITTAL - GRADING ALL 05/19/2008 COMPLETED Review Details
05/28/2008 RESUBMITTAL - GRADING 06/11/2008 COMPLETED Review Details
06/11/2008 RESUBMITTAL - GRADING 06/23/2008 COMPLETED Review Details
07/21/2009 REVISION - GRADING 07/29/2009 COMPLETED Review Details
07/29/2009 REVISION - GRADING 07/29/2009 ACTIVE Review Details

Outstanding Activity Conditions

Permit Number - T08BU00251
Permit Status: Final
Permit Description: GRADING:
Total Outstanding Activity Conditions - 1
Date Name
02/08/2008 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T08BU00251
Permit Description: GRADING:
Total Completed Inspections - 9
Date Description Inspector Results Comments
11/24/2008 STORMWATER FOLLOW-UP INSP NKALAHAR Approved SITE WORK CONTINUING
NO CONCERNS
07/20/2009 GRADING - TIER REV PGEHLEN Approved Received e-mail from PSOMAS (Engineer of Record). In addition to the two ada ramps west of the building, 4 additional scubbers have been added to the site and contactor wants to replace some rip rap with a planter wall. I believe these are all Tier 1 and can be done on the grading plan. I will let the Engineer of Record know.
08/31/2009 STORMWATER INSTALL OF CONTROLS JFEMLING Approved Site is landscaped and stable.
08/31/2009 GRADING - INTERMEDIATE JFEMLING Approved Finish all site work, call for final inspection, provide final grading plan (as-built), provide eng. cert for drainage.
removce all construction debris and temp storage trailers.
09/01/2009 GRADING - FINAL JFEMLING Approved Complete the following and call for re-inspection.
1) Install all HC signs
2) Install all bike parking
3) Remove rock from sidewalk scuppers to allow water to flow freely.
4) Install hole to lock open dumpster gate.
5) Install curb header around planters at rear of building.
6) Provide as-built drawings
7) emove all construction debris and temporary storage trailers and roll offs.
06/17/2010 ENGINEERING PRE-CONSTRUCTION JFEMLING Approved
06/17/2010 NPPO PRE PERMIT INSPECTION JFEMLING Approved
06/17/2010 LANDSCAPE INSPECTION JFEMLING Approved
06/17/2010 GRADING - CHECK FOR ACTIVITY JFEMLING Approved

Documents

File Name Document Type  
APPROVED_01.TIF GRADING PLANS VIEW
APPROVED_02.TIF GRADING PLANS VIEW
APPROVED_03.TIF GRADING PLANS VIEW
001_LANDSCAPE PLAN.TIF GRADING PLANS VIEW
002_IRRIGATION PLAN.TIF GRADING PLANS VIEW
2ND SUBMITTAL 22APR08.TIF DOCUMENTS VIEW
3RD SUBMITTAL 22MAY08.TIF DOCUMENTS VIEW
FLOW CALCS.TIF DOCUMENTS VIEW
STORMWATERPPP_01.TIF DOCUMENTS VIEW
STORMWATERPPP_02.TIF DOCUMENTS VIEW
STORMWATERPPP_03.TIF DOCUMENTS VIEW
STORMWATERPPP_04.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW