Permit: T07EL01798
Permit Details
Status:
Final
Type:
SINGLE FAMILY OTHER
Address:
8840 E CALLE BOLIVAR
Address NEW:
8840 E CALLE BOLIVAR
Apply Date:
10/05/2007
Applicant:
MAYHEW DOUGLAS B
Description:
UPGRADE: 200 AMP
Permit Reviews
Permit Number - T07EL01798
Permit Status: Final
Permit Description: UPGRADE: 200 AMP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/05/2007 | ELECTRICAL | 10/05/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07EL01798
Permit Status: Final
Permit Description: UPGRADE: 200 AMP
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/05/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T07EL01798
Permit Description: UPGRADE: 200 AMP
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/28/2007 | ELECTRIC - SERVICE UPGRADE | RHOLLAND | Approved | IVRS - Inspection :* 1. DO NOT PARALLEL GROUNDING ELECTRODE CONDUCTOR 2. RECONNECT WATER BOND 3. SEAL ENTRANCES ABOVE CURRENT CARRING CONDUCTORS 4. LABEL ALL BREAKERS AS PER 408.4 5. A BOND BUSHING IS NEEDED ON SERVICE NIPPLE - 250.92 6. SEPARATE GROUNDING EQUIPMENT CONDUCTORS 7. PROTECT CABLES ENTERING BACK OF PANEL AND FILL UNUSED PORTION WITH A NON-COMBUSTIBLE PRODUCT 8. ANTI-OXIDE COMPOUND IS NEEDED ON ALL ALUMINUM CONDUCTORS 9. SECURE GROUNDING ELECTRODE CONDUCTOR TO WALL 10. NEED GAS BOND |
| 12/28/2007 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
| 01/11/2008 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | |
| 01/11/2008 | ELECTRIC - UNDERGROUND | RHOLLAND | Approved | |
| 01/14/2008 | PERMIT FINALED | BFLORES | Approved |