Permit: T07CM04449
Permit Details
Apply Date:
11/26/2007
Applicant:
SEAVER FRANKS ARCHITECTS INC AIA
Description:
NEW SHELL BLDG
Architects:
- SEAVER FRANKS ARCHITECTS INC AIA
Contractors:
- CHESTNUT CONSTRUCTION CORPORATIO
Permit Reviews
Permit Number - T07CM04449
Permit Status: Final
Permit Description: NEW SHELL BLDG
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/25/2008 | POST 3RD PARTY REVIEW | 02/22/2008 | COMPLETED |
| 03/14/2008 | POST 3RD PARTY REVIEW | 04/30/2008 | COMPLETED |
| 04/30/2008 | RESUBMITTAL | 05/07/2008 | COMPLETED |
| 05/07/2008 | RESUBMITTAL | 09/23/2008 | COMPLETED |
| 09/23/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 09/30/2008 | COMPLETED |
| 10/23/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 10/23/2008 | COMPLETED |
| 11/26/2007 | PLANS OK TO SUBMIT - 3RD PARTY | 11/26/2007 | COMPLETED |
| 11/26/2007 | 3RD PARTY REVIEW-COMMERCIAL | 01/25/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM04449
Permit Status: Final
Permit Description: NEW SHELL BLDG
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/26/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T07CM04449
Permit Description: NEW SHELL BLDG
Total Completed Inspections - 36
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2008 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* ABS DWV UNDERGROUND OK TO COVER WATER TEST OK |
| 07/30/2008 | PLUMBING - PRE SLAB | RRICH | Approved | IVRS - Inspection :* |
| 08/19/2008 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* 1. TEMP POWER TO BE DISCONNECTED FROM GENERATOR AND INSTALLED IN A SAFE MANNER, ASAP - COX. ELEC. CONTR. 2. TEMP CABLE IS SUBJECT TO PHYSICAL DAMAGE JUST LAYING ON GROUND, ALSO #12 GA. WIRE IS OVERFUSED AT 50 AMP CKT BRKR 3. A STOP WORK ORDER WILL BE ISSUED IF NOT ADDRESSED 24 HRS. 4. OK 3/0 CU TO 20' REBAR UFER |
| 10/14/2008 | FRAMING | GDABBS | Approved | IVRS - Inspection :* |
| 10/14/2008 | ROOF NAILING | GDABBS | Approved | IVRS - Inspection :* |
| 10/17/2008 | STEM WALL/RETAINING WALL | MHENSON | Approved | IVRS - Inspection :* 1. NORTH RETAINING WALL AND SITE WALLS ON EAST SIDE 2. TERRACON SPECIAL INSPECTED |
| 10/28/2008 | PLUMBING - PROGRESS | RLEDONNE | Approved | IVRS - Inspection :* 1. OVERHEAD WATER PIPING INSTALLED PER PLAN TEST OK 2. WATER PIPING IN WALL TO MOP SINK TEST OK |
| 10/28/2008 | PLUMBING - YARD WTR LINE/TEST | RLEDONNE | Approved | IVRS - Inspection :* |
| 10/29/2008 | ELECTRIC - OUTDOOR LIGHTING | DSANTACR | Approved | IVRS - Inspection :* OK POLE BASES |
| 11/20/2008 | EXCAVATION/LAYOUT REBAR & ZON | GDABBS | Approved | IVRS - Inspection :* CONCRETE MONUMENT SIGN REINFORCEMENT STEEL OK AS PER DETAIL #3 SHEET #S2.1.1 AND DETAIL #214 SHEET #S5.0 |
| 12/02/2008 | ELECTRIC - UNDERGROUND | RJIROUDE | Approved | IVRS - Inspection :* 1. OK 6 - 3" PVC FROM TEP XFMR TO BUILDING 2. OK 6 - 3" PVC FROM TEP XFMR HEADING SOUTHWEST 70' FOR FUTURE BUILDING |
| 12/08/2008 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* OK SOFFITS LTG. ROUGH AT EAST ENTRIES |
| 12/08/2008 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* HOT WATER TO MOP SINK INSULATION OK IN WALL |
| 12/30/2008 | BUILDING - PROGRESS | GDABBS | Approved | IVRS - Inspection :* 1) DUMPSTER PADS, TRUCK LOADING AREA AND TRUCK TURN AROUND AT N/W CORNER OK |
| 12/30/2008 | BUILDING PRE-SLAB | GDABBS | Approved | IVRS - Inspection :* 1) REINFORCEMENT STEEL AT TOW DUMPSTER PADS ON WEST SIDE OF BLDG, TRUCK LOADING DOCK SLAB AT SOUTH END AND TRUCK TURN AROUND AT NORTH/WEST CORNER |
| 02/02/2009 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED FOR "HOUSE METER" PER D. SANTACRUZ |
| 02/10/2009 | FIRE - HYDRANTS | LTHOMAS | Approved | |
| 02/10/2009 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
| 02/10/2009 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
| 02/10/2009 | FIRE - FINAL | LTHOMAS | Approved | |
| 02/13/2009 | PLUMBING - ROOF DRAINS | RLEDONNE | Approved | |
| 02/13/2009 | PLUMBING - SEWER HCS CONNECT | RLEDONNE | Approved | |
| 02/13/2009 | PLUMBING - BACK WATER VALVE | RLEDONNE | Approved | |
| 02/13/2009 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* |
| 02/17/2009 | ELECTRIC - TEMP POWER FOR TEST | DSANTACR | Approved | |
| 02/17/2009 | ELECTRIC - PROGRESS | DSANTACR | Approved | |
| 02/17/2009 | U VALUE FOR WINDOW | LHANLY | Approved | |
| 02/17/2009 | ELECTRIC - CABLE DROP | DSANTACR | Approved | IVRS - Inspection :* |
| 02/17/2009 | OUTDOOR LIGHTING FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 02/17/2009 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 02/17/2009 | SIGN - FINAL | JYBARRA | Approved | |
| 02/17/2009 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | PER EMAIL |
| 03/26/2009 | LANDSCAPE - FINAL | PMCLAUGH | Approved | |
| 04/30/2009 | BUILDING - FINAL | MHENSON | Approved | IVRS - Inspection :* LETTER OF COMPLETION - SHELL |
| 05/04/2009 | NPPO - FINAL | ACONNOR | Approved | |
| 06/02/2009 | ENGINEERING - FINAL | DROBERTS | Approved |