Permit: T07CM04449

Parcel: 14041129A

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
03/26/2009 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
01/27/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SCREEN WALL FOOTINGS NWC OF BLDG. 1
SPECIAL INSPECTED
11/20/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONCRETE MONUMENT SIGN REINFORCEMENT
STEEL OK AS PER DETAIL #3 SHEET #S2.1.1 AND
DETAIL #214 SHEET #S5.0
11/19/2008 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
NO SUPERINTENDENT ON SITE -
DON'T KNOW WHAT TO LOOK AT
11/14/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
MONUMENT SIGN FOOTING OK
10/28/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. REMAINING LIGHT POLE CAISSONS
2. SPECIAL INSPECTED
10/27/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. 18 CAISSONS AS MARKED ON PLAN 24" X 3/4 BOLTS
2. TERRACON SPECIAL INSPECTED
09/30/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. LOADING DOCK AND NORTH RETAINING WALL FOOTING
OK TO POUR
2. TERRACON SPECIAL INSPECTED
09/10/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SCREEN WALL FOOTINGS E @ 4.2, 5.2, 6.2
E2 @ 1.2, 2.2, 3.2

1. TERRACON SPECIAL INSPECTED
2. ADD VERTICALS AT CORNER CELLS
08/28/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
BUILDING #1
REINFORCEMENT STEEL @ TILT PANEL #3 -
SPECIAL INSPECTION PERFORMED BY TERRACON/SEAN
08/27/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
BLDG. #1
REINFORCEMENT STEEL @ TILT UP PANELS #5, 6, 14, 15, 16, 17, 18, 19, 20 AND 21
SPECIAL INSPECTOR TERRACON COMPLETED INSPECTION
OK TO POUR
08/22/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. TILT PANELS 1, 2, 4, 7, 8, 9, 10, 11, 12, 13, 14
2. TERRACON SPECIAL INSPECTED
3. PA STRAPS FOR LEDGERS ON SITE TO BE WET SET
08/15/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
BLDG. #1 FOOTINGS @ GRID LINES A/1 THRU 7
1/A THRU E, E/1 THRU 7 AND 7/A THRU E - OK
TERRACON HAS INSPECTED & APPROVED
07/24/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 15 INTERIOR COLUMN FOOTINGS

TERRACON SPECIAL INSPECTED
LINE 2 - B, C, D
LINE 3 - B, C, D
LINE 4 - B, C, D
LINE 5 - B, C, D
LINE 6 - B, C, D