Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL NEW
Address:
5983 E GRANT RD
Apply Date:
03/12/2007
Applicant:
N/A
Description:
NEW SHELL GRANT ROAD PROFESSIONAL PLAZA BLDG # 3
Contractors:
  • R AND L BUILDERS L L C

Permit Reviews

Permit Number - T07CM01000
Permit Status: Final
Permit Description: NEW SHELL GRANT ROAD PROFESSIONAL PLAZA BLDG # 3
Start Date Submittal Complete Date Status  
03/12/2007 PLANS OK TO SUBMIT - COMM 03/19/2007 COMPLETED Review Details
03/19/2007 COMMERCIAL NEW 05/16/2007 COMPLETED Review Details
06/22/2007 RESUBMITTAL 08/06/2007 COMPLETED Review Details
08/06/2007 RESUBMITTAL 08/24/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T07CM01000
Permit Status: Final
Permit Description: NEW SHELL GRANT ROAD PROFESSIONAL PLAZA BLDG # 3
Total Outstanding Activity Conditions - 1
Date Name
03/12/2007 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T07CM01000
Permit Description: NEW SHELL GRANT ROAD PROFESSIONAL PLAZA BLDG # 3
Total Completed Inspections - 41
Date Description Inspector Results Comments
09/05/2008 PLUMBING - ROUGH, SOIL BBENEDON Approved IVRS - Inspection :*
REDLINE ACTUAL INVERT ELEVATIONS
09/16/2008 ELECTRIC - UFER RHOLLAND Approved IVRS - Inspection :*
OK 3/0 (X3) TO 20' REBAR
09/25/2008 PLUMBING - PRE SLAB BBENEDON Approved IVRS - Inspection :*
OK FOR SLAB
CALL TO INSP. PIPING IN COLS WHEN READ
10/08/2008 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved IVRS - Inspection :*
PIER NORTH OF ELEVATOR SHAFT -- F/10 FOOTING
10/10/2008 ELECTRIC - UNDERGROUND RHOLLAND Approved IVRS - Inspection :*
OK PVC BUILDING TO ELEVATOR EQUIPT. RM.
4 - 1"
1 - 3/4"
1 - 1 1/4"
10/23/2008 REINFORCED MASONRY PRE-GROUT JBURGE Approved IVRS - Inspection :*
ELEVATOR SHAFT TOPPED OUT @ 29'4" GROUTED
10/30/2008 BUILDING PRE-SLAB JBURGE Approved IVRS - Inspection :*
2ND FLOOR SLAB - HAMBRO SYSTEM -- OK TO POUR
11/13/2008 STEM WALL/RETAINING WALL JBURGE Approved IVRS - Inspection :*
11/20/2008 ROOF NAILING JBURGE Approved IVRS - Inspection :*
OK TO DRY IN
11/20/2008 EXT METAL CLIPS/EXT SHEATHING JBURGE Approved IVRS - Inspection :*
OK TO STUCCO MESH
12/12/2008 PLUMBING - ABOVE CEILING BBENEDON Approved IVRS - Inspection :*
WATER OVERHEAD TO MS OK
12/12/2008 PLUMBING - ROOF DRAINS BBENEDON Approved IVRS - Inspection :*
12/15/2008 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
12/15/2008 ELECTRIC - ABOVE CEILING RMORENO Approved IVRS - Inspection :*
LOWER OVERHANG LIGHTING ON E.SIDE OF BUILDING AND NEXT TO STAIRS OK -- ELEVATOR CEILING OK
12/30/2008 ELECTRIC - CABLE DROP RMORENO Approved IVRS - Inspection :*
1) RELAYS WILL BE PUT IN AFTER CHANGE ORDER FROM TIME CLOCKS
12/30/2008 ELECTRIC - TEMPORARY SERVICE RMORENO Approved IVRS - Inspection :*
12/31/2008 STUCCO MESH JBURGE Approved IVRS - Inspection :*
1) ALL AREAS EXCEPT 2ND FLOOR BALCONY
12/31/2008 TEP CLEARANCE - AM JWEATHER Approved TMPP CLEARED PER R. MORENO
03/06/2009 PLUMBING - FINAL BBENEDON Approved IVRS - Inspection :*
03/09/2009 ELECTRIC - FINAL RMORENO Approved IVRS - Inspection :*
EM LIGHTS ON FIRST AND SECOND FLOOR OK
RELAYS AND J-BOX GROUNDED OK
GFI's OUTSIDE OK
GFI's ROOF OK
ROOF AND AC DISCONNECTS OK
03/09/2009 PLUMBING - SEWER HCS CONNECT BBENEDON Approved
03/09/2009 PLUMBING - BACK WATER VALVE BBENEDON Approved
03/09/2009 PLUMBING - INTERMEDIATE BBENEDON Approved IVRS - Inspection :*
03/10/2009 ELECTRIC - INTERMEDIATE RMORENO Approved
03/10/2009 ELECTRIC - TEMP POWER FOR TEST RMORENO Approved
03/10/2009 NPPO - FINAL ACONNOR Approved
03/10/2009 LANDSCAPE - FINAL ACONNOR Approved
03/10/2009 ZONING - FINAL ACONNOR Approved
03/18/2009 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
OK FOR SHELL FINAL
03/18/2009 SIGN - FINAL JYBARRA Approved SHELL ONLY
03/30/2009 RIGHT OF WAY - FINAL PWHIDDON Approved PER EMAIL
03/30/2009 FIRE - FINAL LTHOMAS Approved
07/14/2009 ENGINEERING - FINAL DROBERTS Approved THE PREVIOUSLY NOTED DEFICIENCIES HAVE BEEN COMPLETED AT THIS TIME.
07/24/2009 BUILDING - FINAL JBURGE Approved IVRS - Inspection :*
07/24/2009 SHEET ROCK NAILING JBURGE Approved IVRS - Inspection :*
07/24/2009 FRAMING JBURGE Approved IVRS - Inspection :*
07/27/2009 FIRE SPKLR - FINAL LTHOMAS Approved
07/27/2009 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved
07/27/2009 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
07/27/2009 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
07/27/2009 BUILDING ABOVE CEILING JBURGE Approved

Documents