Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T07BU01586
Permit Details
Apply Date:
07/24/2007
Applicant:
PHYSICAL RESOURCE ENGINEERING
Description:
COPPER VISTA II GRADING - CUT 950 CY FILL 1925CY
Contractors:
- LA CAUSA CONSTRUCTION L L C
Permit Reviews
Permit Number - T07BU01586
Permit Status: Final
Permit Description: COPPER VISTA II GRADING - CUT 950 CY FILL 1925CY
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/08/2008 | RESUBMITTAL - GRADING ALL | 04/08/2008 | COMPLETED |
06/23/2008 | RESUBMITTAL - GRADING ALL | 11/25/2008 | COMPLETED |
07/24/2007 | PLANS OK TO SUBMIT - GRADING | 07/24/2007 | COMPLETED |
07/24/2007 | GRADING | 11/26/2007 | COMPLETED |
11/25/2008 | RESUBMITTAL - GRADING ALL | 12/18/2008 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T07BU01586
Permit Description: COPPER VISTA II GRADING - CUT 950 CY FILL 1925CY
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/15/2008 | ENGINEERING PRE-CONSTRUCTION | MAVERY | Approved | Completed pre-con with George 237-6259. Went over site stabilization with contractor. |
12/30/2008 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
01/05/2009 | STORMWATER INSTALL OF CONTROLS | MAVERY | Approved | All controls installed. |
12/03/2012 | GRADING - INTERMEDIATE | RLEDONNE | Approved | GOT WITH GRADING CONTRACTOR ABOUT CROSS SLOP OVER 2% IN PARKING LOT ON SOUTH WEST SIDE OF SITE. |
12/12/2012 | GRADING - CHECK FOR ACTIVITY | RLEDONNE | Approved | NO ACTIVITY ON SITE AT THIS TIME. |
09/22/2020 | SWPPP CORRECTION NOTICE | DROBERTS | Approved | APPEARS TO HAVE BEEN CONSTRUCTED PER THE APPROVED PLANS AND WAS OVER SEEN BY JAMES FEMLING, MY PREVIOUS SUPERVISOR. |
09/22/2020 | LANDSCAPE INSPECTION | DROBERTS | Approved | APPEARS TO HAVE BEEN CONSTRUCTED PER THE APPROVED PLANS AND WAS OVER SEEN BY JAMES FEMLING, MY PREVIOUS SUPERVISOR. |
09/22/2020 | STORMWATER FOLLOW-UP INSP | DROBERTS | Approved | APPEARS TO HAVE BEEN CONSTRUCTED PER THE APPROVED PLANS AND WAS OVER SEEN BY JAMES FEMLING, MY PREVIOUS SUPERVISOR. |
09/22/2020 | GRADING - FINAL | DROBERTS | Approved | APPEARS TO HAVE BEEN CONSTRUCTED PER THE APPROVED PLANS AND WAS OVER SEEN BY JAMES FEMLING, MY PREVIOUS SUPERVISOR. |