Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU01586
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2020 | STORMWATER FOLLOW-UP INSP | Approved | APPEARS TO HAVE BEEN CONSTRUCTED PER THE APPROVED PLANS AND WAS OVER SEEN BY JAMES FEMLING, MY PREVIOUS SUPERVISOR. | |
| 09/20/2012 | STORMWATER FOLLOW-UP INSP | Closed | GOT WITH LUIS FROM EAGEL ROCK TO REPAIR SWPPP CONTROLS. | |
| 07/17/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO TRACK OUT . | |
| 07/10/2012 | STORMWATER FOLLOW-UP INSP | Continued | STILL NO TRACK OUT ROCK. | |
| 05/17/2012 | STORMWATER FOLLOW-UP INSP | Continued | COMPLET CONTROLS ON EAST SIDE OF SITE ANDAT BASIN IN STREET. | |
| 05/16/2012 | STORMWATER FOLLOW-UP INSP | Continued | BOB STILL INSTALLING SWPPP CONTROLS. | |
| 08/06/2009 | STORMWATER FOLLOW-UP INSP | Continued | Maintain storm controls and sweep street as needed. | |
| 06/24/2009 | STORMWATER FOLLOW-UP INSP | Continued | Contractor work on utilities on site and in street, controls in place | |
| 02/18/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to sweep Jeanette St. | |
| 01/29/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to sweep track out from site. Super phone number is not working. | |
| 01/13/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | SWPPP controls in place. No concerns at this time. |