Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T07BU01353
Permit Details
Apply Date:
06/20/2007
Applicant:
J R TUTTLE CO
Description:
GRADING:
Contractors:
- J R TUTTLE CO
Permit Reviews
Permit Number - T07BU01353
Permit Status: Si_xpire
Permit Description: GRADING:
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/20/2007 | PLANS OK TO SUBMIT - GRADING | 06/20/2007 | COMPLETED |
06/20/2007 | GRADING | 07/16/2007 | COMPLETED |
07/31/2007 | RESUBMITTAL - GRADING ALL | 09/06/2007 | COMPLETED |
10/09/2007 | RESUBMITTAL - GRADING ALL | 10/23/2007 | COMPLETED |
10/23/2007 | RESUBMITTAL - GRADING | 02/28/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07BU01353
Permit Status: Si_xpire
Permit Description: GRADING:
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
06/20/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
10/19/2007 | A copy of the Arizona Pollutant Discharge Elimination System (AzPDES) General Permit must accompany the SWPPP. On the plan in a general note state a copy of the AzPDES permit provided by ADEQ will be on site with the SWPPP at all times at the construction site. A copy of the general permit can be found online at http://www.azdeq.gov/environ/water/permits/links.html (Part IV.F) On the SWPPP the Owner and Operator (1) certification statement must be signed upon start of construction. This assures the City of Tucson prior to issuance of a grading permit that there is a designated responsible party for the SWPPP. Call for a Pre-construction meeting prior to start of earthwork. To schedule a DSD Pre-construction meeting, SWPPP inspection or general Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html Provide completed NOI at time of pre-construction meeting. |
Completed Inspections
Permit Status: Si_xpire
Permit Number: T07BU01353
Permit Description: GRADING:
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2007 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | MET WITH SUPERINTENDENT (MIKE HANON) 940-3361 DISCUSSED APPROVED SWPPP. IDENTIFIED ALL REQUIREMENTS FOR STORM WATER COMPLIANCE. CALL FOR STORM WATER INSTALL OF CONTROLS. |
12/18/2007 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | 1) WADDLE (SILT SOCK HAS BEEN INSTALLED ON PERIMETER OF SITE. 2) NEED TO RE-ESTABLISH ROCK ENTRANCE 3) POST A COPY OF YOUR NOI AT ENTRANCE TO SITE. 4) PROVIDE A COPY OF YOUR APPROVED GRADING PLAN AND SWPPP ON SITE. 5) PROVIDE DOCUMENTATION OF STORM WATER SELF INSPECTIONS REQUIRED BY YOUR SWPPP. |
10/28/2008 | GRADING - INTERMEDIATE | MRUSSO | Approved | SUBGRADE IS BEING CONSTRUCTED FOR PAVING. MOST CURBING HAS BEEN INSTALLED RET/DET BASINS NOT COMPLETED. UNDERGROUND RET/DET HAS BEEN INSTALLED PERIMETER SEDIEMNT CONTROLS MUST BE RE-ESTABLISHED AND MAINTAINED UNTIL THE SITE IS 100% STABILIZED. |
10/28/2008 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | SUBGRADE IS BEING CONSTRUCTED FOR PAVING. MOST CURBING HAS BEEN INSTALLED RET/DET BASINS NOT COMPLETED. UNDERGROUND RET/DET HAS BEEN INSTALLED PERIMETER SEDIEMNT CONTROLS MUST BE RE-ESTABLISHED AND MAINTAINED UNTIL THE SITE IS 100% STABILIZED. |
11/28/2008 | GRADING - FINAL | MRUSSO | Approved | NOT READT FOR INSPECTION |
04/23/2009 | LANDSCAPE INSPECTION | ACONNOR | Approved | |
04/24/2009 | PERMIT FINALED | KMEDINA | Approved | |
04/24/2009 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | |
04/24/2009 | STORMWATER FINAL INSPECTION | MRUSSO | Approved |