Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/24/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
10/28/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SUBGRADE IS BEING CONSTRUCTED FOR PAVING. MOST CURBING HAS BEEN INSTALLED RET/DET BASINS NOT COMPLETED. UNDERGROUND RET/DET HAS BEEN INSTALLED PERIMETER SEDIEMNT CONTROLS MUST BE RE-ESTABLISHED AND MAINTAINED UNTIL THE SITE IS 100% STABILIZED. |
|
07/10/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
06/24/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
05/29/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) PERFORM STORM WATER SELF INSP PER PLAN 2) CLEAN OUT CONCRETE WASH OUT 3) MAINTAIN SW CONTROLS UNTIL THE SITE IS PAVED 4) CONT TO SWEEP UP TRACKING AS NEEDED |
|
04/08/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) ENSURE STORM WATER CONTROLS ARE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT. 2) RE-INSTALL A STABILIZED ENTRANCE. 3) CONTINUE TO SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAY. 4) DISPOSE OF CONCRETE WASTE WHEN WASH OUT IF FULL. 5) CONTINUE TO PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM |
|
02/21/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
01/17/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) POST COPY OF NOI ON SITE 2) CONTINUE TO SWEEP UP DIRT OFF OF PUBLIC ROADWAY ROUTINELY. 3) CONTINUE TO PERFORM SW SELF INSPECTIONS PER SWPPP. JR TUTTLE 940-3361 (MIKE HANNAN) |
|
01/10/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | RE-ESTABLISH STABILIZED CONSTRUCTION ENTRANCE - SWEEP UP TRACKING OFF OF ROADWAY. |