Permit: T07BU00215
Permit Details
Apply Date:
01/26/2007
Applicant:
STANLEY JEFF
Description:
GRADING: 500CY CUT 1500CY FILL
Permit Reviews
Permit Number - T07BU00215
Permit Status: Final
Permit Description: GRADING: 500CY CUT 1500CY FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/04/2008 | RESUBMITTAL - GRADING ALL | 01/29/2008 | COMPLETED |
| 01/26/2007 | PLANS OK TO SUBMIT - GRADING | 01/26/2007 | COMPLETED |
| 01/26/2007 | GRADING | 03/15/2007 | COMPLETED |
| 02/26/2008 | RESUBMITTAL - GRADING ALL | 03/19/2008 | COMPLETED |
| 06/12/2008 | RESUBMITTAL - GRADING ALL | 07/02/2008 | COMPLETED |
| 07/11/2008 | RESUBMITTAL - GRADING | 07/22/2008 | COMPLETED |
| 07/14/2009 | REVISION - GRADING | 07/20/2009 | COMPLETED |
| 07/22/2008 | RESUBMITTAL - GRADING | 08/05/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07BU00215
Permit Status: Final
Permit Description: GRADING: 500CY CUT 1500CY FILL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/26/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T07BU00215
Permit Description: GRADING: 500CY CUT 1500CY FILL
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2008 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | REVIEWED SWPPP CONTRACTOR HAS ESTABLISHED A DEFINED GRADING LIMIT. A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED. MOST PERIMETER SEDIMENT CONTROLS (SILT SOCK) HAVE BEEN INSTALLED. CONTRACTOR MUST INSTALL A CONCRETE/MATERIALS WASH-OUT ON SITE AND CONTINUE TO SWEEP UP TRACKING OFF OF PUBLIC ROADWAY. CONTRACTOR WANTS TO CHANGE APPROVED GRADING PLAN BY NOT INSTALLING CURBING ON PRIVATE ROADWAY, AND INSTALLING A THICKENED EDGE WITH A ROCK RIP RAP BORDER. ENSURE MAINT SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. CONTRACTOR: LEE 850-7990 SWPPP GUY: JAY KNOLL 425-0920 OWNER: LUIS YBARRA 603-2287 |
| 08/26/2008 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | STORM WATER CONTROLS HAVE BEEN INSTALLED PER THE APPROVED SWPPP. ENSURE CONTROLS ARE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION. |
| 11/03/2008 | GRADING - INTERMEDIATE | MRUSSO | Approved | SCOUR HOLES FOR CULVERT OUTLETS HAVE NOT BEEN INSTALLED 48" CULVERT = 8'X12'/ 66" CULVERT = 10'X15'. NO CURB OR PAVEMENT. 66" CULVERT NOT INSTALLED YET. |
| 07/15/2009 | GRADING - TIER REV | JGREEN | Approved | Stamped approved plan dated 08JUL09. |
| 11/04/2009 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 02/11/2010 | GRADING - FINAL | MRUSSO | Approved | SITE HAS BEEN COMPLETED PER THE APPROVED REVISED PLANS |
| 02/11/2010 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | SITE IS STABILIZED PER THE APPROVED PLAN |
| 08/23/2010 | LANDSCAPE INSPECTION | MRUSSO | Approved |