Permit: T06EL00778
Permit Details
Apply Date:
04/25/2006
Applicant:
THRAN ADAM
Description:
Svc upgrade to 200 amp
Contractors:
- T AND A ELECTRIC L L C
Outstanding Activity Conditions
Permit Number - T06EL00778
Permit Status: Expired
Permit Description: Svc upgrade to 200 amp
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/25/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T06EL00778
Permite Description: Svc upgrade to 200 amp
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2007 | ELECTRIC - UNDERGROUND | N/A | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
| 05/22/2007 | ELECTRIC - INTERMEDIATE | N/A | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
| 05/22/2007 | ELECTRIC - FINAL | N/A | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. LABEL SERVICE DISCONNECT PER NEC 230.70 2. NEED PANEL DIRECTORY PER NEC 408.4 3. INSTALL BUSHING AROUND CABLES THROUGH 2" KNOCKOUT BACK OF PANEL. 4. INSTALL BREAKERS LISTED FOR USE IN PANEL - NEC 110.3 5. REIDENTIFY WHITE WIRE USED AS PHASE CONDUCTOR FOR SPA. 6. INSTALL 2 GROUND RODS MIN. 6' APART - NEC 250 7. NEED TO BOND GAS & WATER PIPING - NEC 250 8. BOND OFFSET NIPPLE & SERVICE RISER PER NEC 250.92 9. CANNOT SEE INTO METER ENCLOSURE SERVICE ENERGIZED PRIOR TO APPROVALS. 10. PANEL DOOR DOES NOT CLOSE PROPERLY |