Status:
C of o
Type:
COMMERCIAL NEW
Address NEW:
306 N ALVERNON WY 07
Apply Date:
12/14/2006
Applicant:
N/A
Description:
HOTEL
Architects:
  • KEVIN HOWARD ARCHITECTS
Contractors:
  • HICKAM ARNOLD DEVELOPMENT L L C

Permit Reviews

Permit Number - T06CM06331
Permit Status: C of o
Permit Description: HOTEL
Start Date Submittal Complete Date Status  
01/08/2008 RESUBMITTAL 02/21/2008 COMPLETED Review Details
02/21/2008 3RD PARTY REVIEW-REVISION/OTHER 02/21/2008 COMPLETED Review Details
03/13/2008 3RD PARTY REVIEW-REVISION/OTHER 03/13/2008 COMPLETED Review Details
04/13/2007 POST 3RD PARTY REVIEW 04/17/2007 COMPLETED Review Details
05/07/2007 POST 3RD PARTY REVIEW 06/12/2007 COMPLETED Review Details
06/25/2008 3RD PARTY REVIEW-REVISION/OTHER 06/26/2008 COMPLETED Review Details
08/27/2007 POST 3RD PARTY REVIEW 09/20/2007 COMPLETED Review Details
10/02/2008 3RD PARTY REVIEW-REVISION/OTHER-2ND 10/07/2008 COMPLETED Review Details
10/23/2007 RESUBMITTAL 01/08/2008 COMPLETED Review Details
11/03/2008 3RD PARTY REVIEW-REVISION/OTHER 11/05/2008 COMPLETED Review Details
12/14/2006 PLANS OK TO SUBMIT - 3RD PARTY 12/19/2006 COMPLETED Review Details
12/19/2006 3RD PARTY REVIEW-COMMERCIAL 04/13/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T06CM06331
Permit Status: C of o
Permit Description: HOTEL
Total Outstanding Activity Conditions - 1
Date Name
12/14/2006 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T06CM06331
Permit Description: HOTEL
Total Completed Inspections - 44
Date Description Inspector Results Comments
02/21/2008 PLUMBING - PRE SLAB BBENEDON Approved IVRS - Inspection :*
02/25/2008 BUILDING PRE-SLAB JBURGE Approved IVRS - Inspection :*
COMPACTED @ .97
02/26/2008 ELECTRIC - UFER CCLEMENS Approved IVRS - Inspection :*
NOTE:
CLAMPS TO REBAR GENERALLY NEED TO BE USED AS THEY ARE LISTED TO BE USED AND PROPERLY TIGHTENED/INSTALLED. THIS UFER WAS APPROVED BASED ON THE 20' CONDUCTOR IN FOOTING AS THE ELECTRODE. IF THESE CLAMPS WOULD HAVE BEEN CONNECTED TO REBAR AS GROUNDING ELECTRODE, INSPECTION WOULD HAVE FAILED
03/31/2008 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved 2 @ COLUMN FOOTINGS @ NORTH SIDE OF BUILDING
OK TO POUR
04/02/2008 REINFORCED MASONRY PRE-GROUT JBURGE Approved IVRS - Inspection :*
2 @ PIERS @ NORTH ENTRY @ 0'-4' -- OK TO GROUT
04/16/2008 ROOF NAILING JBURGE Approved IVRS - Inspection :*
OK TO DRY IN ROOF AREAS
04/16/2008 EXT METAL CLIPS/EXT SHEATHING JBURGE Approved IVRS - Inspection :*
OK TO STUCCO MESH WALLS
05/28/2008 PLUMBING - ROOF DRAINS BBENEDON Approved IVRS - Inspection :*
06/03/2008 STUCCO MESH JBURGE Approved IVRS - Inspection :*
OK TO STUCCO
06/03/2008 BUILDING ABOVE CEILING JBURGE Approved IVRS - Inspection :*
HARD CEILINGS
06/03/2008 FRAMING JBURGE Approved IVRS - Inspection :*
06/30/2008 PLUMBING - GAS PRESSURE TEST RRICH Approved IVRS - Inspection :*
07/02/2008 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
OK FOR SHEETROCK
07/02/2008 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
OK FOR SHEETROCK
07/03/2008 PLUMBING - ABOVE CEILING RRICH Approved IVRS - Inspection :*
07/17/2008 SHEET ROCK NAILING JBURGE Approved IVRS - Inspection :*
OK TO TAPE BOTH FLOORS (ROOMS)
07/18/2008 PLUMBING - ROUGH, SOIL BBENEDON Approved VERIFY IF BACK WATER VALVE IS NEEDED PER NOTE ON SHEET 3
07/18/2008 PLUMBING - YARD WTR LINE/TEST BBENEDON Approved IVRS - Inspection :*
YARD WATER OK NEED TO SEE FINAL CONN. 100 PSI TEST
07/18/2008 PLUMBING - SEWER HCS CONNECT BBENEDON Approved IVRS - Inspection :*
08/28/2008 PLUMBING - INTERMEDIATE BBENEDON Approved IVRS - Inspection :*
WATER PIPING INSULATION OK
11/13/2008 ELECTRIC - CABLE DROP DSANTACR Approved IVRS - Inspection :*
11/13/2008 ELECTRIC - ABOVE CEILING DSANTACR Approved IVRS - Inspection :*
11/13/2008 ELECTRIC - UNDERGROUND DSANTACR Approved IVRS - Inspection :*
11/13/2008 ELECTRIC - INTERMEDIATE DSANTACR Approved IVRS - Inspection :*
11/13/2008 OUTDOOR LIGHTING FINAL DSANTACR Approved IVRS - Inspection :*
11/13/2008 ELECTRIC - FINAL DSANTACR Approved IVRS - Inspection :*
11/13/2008 ELECTRIC - OUTDOOR LIGHTING DSANTACR Approved IVRS - Inspection :*
11/13/2008 ELECTRIC - RECONNECT DSANTACR Approved IVRS - Inspection :*
11/13/2008 ELECTRIC - CONSTRUCTION POWER DSANTACR Approved IVRS - Inspection :*
11/14/2008 MECHANICAL - FINAL MRAMBER Approved IVRS - Inspection :*
01/20/2009 PLUMBING - GAS PRESS TEST FNL BBENEDON Approved IVRS - Inspection :*
01/28/2009 U VALUE FOR WINDOW JBURGE Approved IVRS - Inspection :*
01/30/2009 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
01/30/2009 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
01/30/2009 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved
01/30/2009 FIRE SPKLR - FINAL LTHOMAS Approved
02/06/2009 SIGN - FINAL JYBARRA Approved
02/09/2009 PLUMBING - FINAL BBENEDON Approved IVRS - Inspection :*
02/10/2009 BUILDING - FINAL LHANLY Approved
05/19/2010 NPPO - FINAL JFEMLING Approved Approved
05/19/2010 LANDSCAPE - FINAL JFEMLING Approved Approved
05/19/2010 ENGINEERING - FINAL JFEMLING Approved All items complete, approved
05/24/2010 FIRE - FINAL MHERNADE Approved Work associated with PIA (I-2008-015) has not been completed. Please contact Martin Hernandez at 260-9109 for details.
06/18/2010 RIGHT OF WAY - FINAL MHERNADE Approved

Documents

File Name Document Type  
TEMP C OF O_02-10-2009.TIF CERT OF OCC VIEW
None CERT OF OCC VIEW
001__P1.04.TIF CONSTRPLANS VIEW
002__P2.01.TIF CONSTRPLANS VIEW
003__P3.01.TIF CONSTRPLANS VIEW
None CONSTRPLANS VIEW
None DOCUMENTS VIEW