Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T06CM06331
Permit Details
Apply Date:
12/14/2006
Applicant:
N/A
Description:
HOTEL
Architects:
- KEVIN HOWARD ARCHITECTS
Contractors:
- HICKAM ARNOLD DEVELOPMENT L L C
Permit Reviews
Permit Number - T06CM06331
Permit Status: C of o
Permit Description: HOTEL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/08/2008 | RESUBMITTAL | 02/21/2008 | COMPLETED |
| 02/21/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 02/21/2008 | COMPLETED |
| 03/13/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 03/13/2008 | COMPLETED |
| 04/13/2007 | POST 3RD PARTY REVIEW | 04/17/2007 | COMPLETED |
| 05/07/2007 | POST 3RD PARTY REVIEW | 06/12/2007 | COMPLETED |
| 06/25/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 06/26/2008 | COMPLETED |
| 08/27/2007 | POST 3RD PARTY REVIEW | 09/20/2007 | COMPLETED |
| 10/02/2008 | 3RD PARTY REVIEW-REVISION/OTHER-2ND | 10/07/2008 | COMPLETED |
| 10/23/2007 | RESUBMITTAL | 01/08/2008 | COMPLETED |
| 11/03/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 11/05/2008 | COMPLETED |
| 12/14/2006 | PLANS OK TO SUBMIT - 3RD PARTY | 12/19/2006 | COMPLETED |
| 12/19/2006 | 3RD PARTY REVIEW-COMMERCIAL | 04/13/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM06331
Permit Status: C of o
Permit Description: HOTEL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/14/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T06CM06331
Permit Description: HOTEL
Total Completed Inspections - 44
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2008 | PLUMBING - PRE SLAB | BBENEDON | Approved | IVRS - Inspection :* |
| 02/25/2008 | BUILDING PRE-SLAB | JBURGE | Approved | IVRS - Inspection :* COMPACTED @ .97 |
| 02/26/2008 | ELECTRIC - UFER | CCLEMENS | Approved | IVRS - Inspection :* NOTE: CLAMPS TO REBAR GENERALLY NEED TO BE USED AS THEY ARE LISTED TO BE USED AND PROPERLY TIGHTENED/INSTALLED. THIS UFER WAS APPROVED BASED ON THE 20' CONDUCTOR IN FOOTING AS THE ELECTRODE. IF THESE CLAMPS WOULD HAVE BEEN CONNECTED TO REBAR AS GROUNDING ELECTRODE, INSPECTION WOULD HAVE FAILED |
| 03/31/2008 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | 2 @ COLUMN FOOTINGS @ NORTH SIDE OF BUILDING OK TO POUR |
| 04/02/2008 | REINFORCED MASONRY PRE-GROUT | JBURGE | Approved | IVRS - Inspection :* 2 @ PIERS @ NORTH ENTRY @ 0'-4' -- OK TO GROUT |
| 04/16/2008 | ROOF NAILING | JBURGE | Approved | IVRS - Inspection :* OK TO DRY IN ROOF AREAS |
| 04/16/2008 | EXT METAL CLIPS/EXT SHEATHING | JBURGE | Approved | IVRS - Inspection :* OK TO STUCCO MESH WALLS |
| 05/28/2008 | PLUMBING - ROOF DRAINS | BBENEDON | Approved | IVRS - Inspection :* |
| 06/03/2008 | STUCCO MESH | JBURGE | Approved | IVRS - Inspection :* OK TO STUCCO |
| 06/03/2008 | BUILDING ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* HARD CEILINGS |
| 06/03/2008 | FRAMING | JBURGE | Approved | IVRS - Inspection :* |
| 06/30/2008 | PLUMBING - GAS PRESSURE TEST | RRICH | Approved | IVRS - Inspection :* |
| 07/02/2008 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* OK FOR SHEETROCK |
| 07/02/2008 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* OK FOR SHEETROCK |
| 07/03/2008 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
| 07/17/2008 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* OK TO TAPE BOTH FLOORS (ROOMS) |
| 07/18/2008 | PLUMBING - ROUGH, SOIL | BBENEDON | Approved | VERIFY IF BACK WATER VALVE IS NEEDED PER NOTE ON SHEET 3 |
| 07/18/2008 | PLUMBING - YARD WTR LINE/TEST | BBENEDON | Approved | IVRS - Inspection :* YARD WATER OK NEED TO SEE FINAL CONN. 100 PSI TEST |
| 07/18/2008 | PLUMBING - SEWER HCS CONNECT | BBENEDON | Approved | IVRS - Inspection :* |
| 08/28/2008 | PLUMBING - INTERMEDIATE | BBENEDON | Approved | IVRS - Inspection :* WATER PIPING INSULATION OK |
| 11/13/2008 | ELECTRIC - CABLE DROP | DSANTACR | Approved | IVRS - Inspection :* |
| 11/13/2008 | ELECTRIC - ABOVE CEILING | DSANTACR | Approved | IVRS - Inspection :* |
| 11/13/2008 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | IVRS - Inspection :* |
| 11/13/2008 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* |
| 11/13/2008 | OUTDOOR LIGHTING FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 11/13/2008 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 11/13/2008 | ELECTRIC - OUTDOOR LIGHTING | DSANTACR | Approved | IVRS - Inspection :* |
| 11/13/2008 | ELECTRIC - RECONNECT | DSANTACR | Approved | IVRS - Inspection :* |
| 11/13/2008 | ELECTRIC - CONSTRUCTION POWER | DSANTACR | Approved | IVRS - Inspection :* |
| 11/14/2008 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
| 01/20/2009 | PLUMBING - GAS PRESS TEST FNL | BBENEDON | Approved | IVRS - Inspection :* |
| 01/28/2009 | U VALUE FOR WINDOW | JBURGE | Approved | IVRS - Inspection :* |
| 01/30/2009 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
| 01/30/2009 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
| 01/30/2009 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
| 01/30/2009 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
| 02/06/2009 | SIGN - FINAL | JYBARRA | Approved | |
| 02/09/2009 | PLUMBING - FINAL | BBENEDON | Approved | IVRS - Inspection :* |
| 02/10/2009 | BUILDING - FINAL | LHANLY | Approved | |
| 05/19/2010 | NPPO - FINAL | JFEMLING | Approved | Approved |
| 05/19/2010 | LANDSCAPE - FINAL | JFEMLING | Approved | Approved |
| 05/19/2010 | ENGINEERING - FINAL | JFEMLING | Approved | All items complete, approved |
| 05/24/2010 | FIRE - FINAL | MHERNADE | Approved | Work associated with PIA (I-2008-015) has not been completed. Please contact Martin Hernandez at 260-9109 for details. |
| 06/18/2010 | RIGHT OF WAY - FINAL | MHERNADE | Approved |