Permit Details

Status:
Expired
Type:
COMMERCIAL ALTERATION
Address NEW:
2470 N ORACLE RD #130
Apply Date:
10/26/2006
Applicant:
ERIN HASTREITER
Description:
TI: RETAIL OFFICE (T06DV01173)
Architects:
  • SAKELLAR, C NICHOLAS
Contractors:
  • FARWEST DEVELOPMENT AND CONSTRUCTION OF THE SOUT

Permit Reviews

Permit Number - T06CM05629
Permit Status: Expired
Permit Description: TI: RETAIL OFFICE (T06DV01173)
Start Date Submittal Complete Date Status  
02/12/2007 POST 3RD PARTY REVIEW 02/14/2007 COMPLETED Review Details
10/26/2006 PLANS OK TO SUBMIT - 3RD PARTY 10/31/2006 COMPLETED Review Details
12/04/2006 PLANS OK TO SUBMIT - 3RD PARTY 12/05/2006 COMPLETED Review Details
12/05/2006 3RD PARTY REVIEW-COMMERCIAL TI 02/12/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T06CM05629
Permit Status: Expired
Permit Description: TI: RETAIL OFFICE (T06DV01173)
Total Outstanding Activity Conditions - 1
Date Name
10/26/2006 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Expired
Permit Number: T06CM05629
Permite Description: TI: RETAIL OFFICE (T06DV01173)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/03/2007 SIGN - FINAL N/A Partial Approval BILLBOARD STILL EXISTS AT THIS LOCATION WITHOUT PROVIDING REQUIRED PARKING AND LOADING ZONE - DO NOT RELEASE C/O W/O APPROVAL FROM ERNIE OR CRAIG.

Completed Inspections

Permit Status: Expired
Permit Number: T06CM05629
Permit Description: TI: RETAIL OFFICE (T06DV01173)
Total Completed Inspections - 25
Date Description Inspector Results Comments
02/15/2007 PLUMBING - ROUGH, SOIL BBENEDON Approved IVRS - Inspection :*
02/26/2007 FRAMING AQUIROZ Approved IVRS - Inspection :*
02/27/2007 PLUMBING - INTERMEDIATE RMYERS Approved IVRS - Inspection :*
1. GAS INSTALLED PER REDLINES - NO ENGINEERING REQ'D
2. ABS DWV THRU ROOF OK
3. COPPER OK
NEED TO SEE HANGERS AT EACH CHANGE OF DIRECTION
OR ELEVATION AND AT THE END OF BRANCHES - THEN EVERY SO MANY FEE PER TABLE 3-1 2003 UPC
4. OK TO COVER WALLS.
02/27/2007 PLUMBING - GAS PRESSURE TEST RMYERS Approved IVRS - Inspection :*
03/01/2007 ELECTRIC - INTERMEDIATE RMAJUTA Approved IVRS - Inspection :*
03/05/2007 SHEET ROCK NAILING AQUIROZ Approved IVRS - Inspection :*
03/13/2007 PLUMBING - GAS PRESS TEST FNL RMYERS Approved IVRS - Inspection :*
CALL 03036 FOR CLOSET FLANGE INSPECTION
PRIOR TO CALLING FINAL
03/15/2007 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
PLANS DRAWN & APPROVED IN ERROR.
IECC SECTION 803.2.8 REQUIRES MIN. R5 DUCT INSULATION NOT R3.5
PROVIDE 1 1/2" MIN. R5 DUCT LINER OR WRAP THE OUTSIDE OF THE DUCT.
INSTALL CEILING DIFFUSERS
CONDENSATE DRAIN OK
STRAP FLEX DUCTS EVERY 5'
03/16/2007 PLUMBING - ABOVE CEILING RMYERS Approved IVRS - Inspection :*
FLANGE OK
03/16/2007 BUILDING ABOVE CEILING AQUIROZ Approved IVRS - Inspection :*
03/20/2007 ELECTRIC - ABOVE CEILING DSANTACR Approved IVRS - Inspection :*
03/22/2007 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
OK FOR FINAL
AIR BALANCE OK
03/22/2007 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
03/22/2007 ELECTRIC - FINAL CCLEMENS Approved IVRS - Inspection :*
03/26/2007 FIRE SPKLR - FINAL LTHOMAS Approved
03/27/2007 RIGHT OF WAY - FINAL MOTERO Approved PER EMAIL
03/27/2007 BUILDING - FINAL AQUIROZ Approved SHELL APPROVE ON 3/27/07
03/27/2007 ELECTRIC - UNDERGROUND CCLEMENS Approved APPROVE JOB CARD
03/27/2007 FIRE - FINAL LTHOMAS Approved
03/27/2007 NPPO - FINAL ACONNOR Approved
03/27/2007 LANDSCAPE - FINAL ACONNOR Approved
03/28/2007 PLUMBING - FINAL RMYERS Approved IVRS - Inspection :*
PLUMBING FINAL OK
OK FOR C OF O S.T.O.I
03/28/2007 PLUMBING - PRE SLAB RMYERS Approved IVRS - Inspection :*
04/02/2007 ENGINEERING - FINAL MRUSSO Approved
05/15/2007 ELECTRIC - TEMP POWER FOR TEST CCLEMENS Approved IVRS - Inspection :*