Permit: T06CM04121
Permit Details
Apply Date:
07/13/2006
Applicant:
N/A
Description:
NEW: SFR TD# 16-68-00 (FOUNDATION ONLY 2-21-07) R1: TRUSSES (2 SETS) 11/21/07
Contractors:
- RAMMED EARTH DEVELOPMENT INC ,
Permit Reviews
Permit Number - T06CM04121
Permit Status: Expired
Permit Description: NEW: SFR TD# 16-68-00 (FOUNDATION ONLY 2-21-07)
R1: TRUSSES (2 SETS) 11/21/07
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/13/2006 | RESIDENTIAL BLDG-MODEL PLAN/ENGINE/WALK THRU | 08/07/2006 | COMPLETED |
08/01/2006 | OTHER | 08/04/2006 | COMPLETED |
11/21/2007 | REVISION - - 1ST | 11/21/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM04121
Permit Status: Expired
Permit Description: NEW: SFR TD# 16-68-00 (FOUNDATION ONLY 2-21-07)
R1: TRUSSES (2 SETS) 11/21/07
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/13/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
08/07/2006 | THE FOLLOWING 9 CONDITIONS WILL APPLY TO PERMIT T06CM04121: 1) A COPY OF THIS PLOT PLAN WITH PERMIT, AND GEOTECHNICAL REPORTS SHALL BE KEPT AT THE SITE AT ALL TIMES, UNTIL FINAL APPROVAL. 2) ANY REVISION TO THIS PLOT PLAN MAY REQUIRE A RE-SUBMITTAL OF THE REVISED PLAN FOR REVIEW. CONTACT DEVELOPMENT SERVICES DEPARTMENT (DSD) ENGINEERING AT 791-5550 TO DISCUSS CHANGES IN GRADING DESIGN. 3) IF GRADING CONSTRUCTION IS EXPECTED TO LAST LONGER THAN THE EXPIRATION DATE ON THE PERMIT, CONTACT DSD TO RENEW OR EXTEND THE PERMIT. IF THE FINAL INSPECTION HAS NOT BEEN COMPLETED BEFORE THE PERMIT EXPIRES, AND THE PERMIT HAS NOT BEEN RENEWED, ADDITIONAL FEES AND REVIEWS MAY BE REQUIRED. 4) WALL OPENINGS SHALL BE PROVIDED TO CONVEY COURTYARD DRAINAGE, WHERE GATES WITH OPENINGS OR OTHER TYPES OF SURFACE OUTLETS ARE NOT PROVIDED. THE WALL OPENINGS SHALL BE PLACED AT LOW POINTS AS INDICATED ON THE APPROVED GRADING PLAN T04BU02986, PER PLOT PLAN FLOW ARROWS, OR AS DESCRIBED IN NOTATIONS ON THE PLOT PLAN. 5) ALL AREAS NOT COVERED BY FOUNDATION OR ESTABLISHED VEGETATION SHALL BE COVERED WITH PERMANENT EROSION CONTROL MEASURES. 6) DAILY SWEEPING OF ADJACENT STREET AREA WILL BE REQUIRED FOR ANY SOIL OR OTHER DEBRIS FROM THE CONSTRUCTION OF THE PROJECT LEAVES THE LOT. 7) A LOCAL TRASH CONTAINER MAY BE REQUIRED IF DEBRIS IS NOT ADEQUATELY CONTROLLED. 8) CONTACT PERMITS AND CODES (791-5100) FOR ANY RIGHT-OF-WAY PERMIT REQUIREMENTS. 9) OCCUPANCY MAY NOT OCCUR UNTIL STREETS ARE COMPLETED AND DSD HAS RECEIVED APPROVAL LETTERS FROM TUCSON WATER AND PCWW, AND ANY ADJACENT IMPROVEMENTS AS LISTED IN THE ASSURANCES ARE COMPLETED AND ACCEPTED BY THE CITY OF TUCSON. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T06CM04121
Permite Description: NEW: SFR TD# 16-68-00 (FOUNDATION ONLY 2-21-07)
R1: TRUSSES (2 SETS) 11/21/07
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
PERMIT FINALED | N/A | Not Inspected |
Completed Inspections
Permit Status: Expired
Permit Number: T06CM04121
Permit Description: NEW: SFR TD# 16-68-00 (FOUNDATION ONLY 2-21-07)
R1: TRUSSES (2 SETS) 11/21/07
Total Completed Inspections - 26
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/24/2007 | PLUMBING - SEWER HCS CONNECT | CRUIZ | Approved | IVRS - Inspection :* |
07/24/2007 | PLUMBING - YARD WTR LINE/TEST | CRUIZ | Approved | IVRS - Inspection :* |
07/24/2007 | PLUMBING - ROUGH, SOIL | CRUIZ | Approved | IVRS - Inspection :* |
08/15/2007 | PLUMBING - PRE SLAB | EDURAZO | Approved | IVRS - Inspection :* |
08/15/2007 | ELECTRIC - UFER | EDURAZO | Approved | IVRS - Inspection :* |
08/15/2007 | EXCAVATION/LAYOUT REBAR & ZON | EDURAZO | Approved | IVRS - Inspection :* |
08/15/2007 | BUILDING PRE-SLAB | EDURAZO | Approved | IVRS - Inspection :* |
09/25/2007 | REINFORCED MASONRY PRE-GROUT | CRUIZ | Approved | IVRS - Inspection :* |
11/23/2007 | ELECTRIC - INTERMEDIATE | RFREIDIN | Approved | IVRS - Inspection :* |
11/30/2007 | ROOF NAILING | CRUIZ | Approved | IVRS - Inspection :* OK TO DRY IN |
11/30/2007 | MECHANICAL - INTERMEDIATE | CRUIZ | Approved | IVRS - Inspection :* |
12/10/2007 | PLUMBING - GAS PRESSURE TEST | CRUIZ | Approved | IVRS - Inspection :* |
12/10/2007 | PLUMBING - INTERMEDIATE | CRUIZ | Approved | IVRS - Inspection :* |
12/10/2007 | FRAMING | CRUIZ | Approved | IVRS - Inspection :* |
12/17/2007 | U VALUE FOR WINDOW | CRUIZ | Approved | IVRS - Inspection :* |
12/17/2007 | STUCCO MESH | CRUIZ | Approved | IVRS - Inspection :* |
12/21/2007 | SHEET ROCK NAILING | EDURAZO | Approved | IVRS - Inspection :* |
01/29/2008 | ASSURANCE | MCARREON | Approved | DRAINAGE TO BE LOOKED AT FOR ENTIRE SITE AT TIME OF FINAL GRADING |
04/07/2008 | ELECTRIC - CABLE DROP | CRUIZ | Approved | IVRS - Inspection :* |
04/08/2008 | TEP CLEARANCE - AM | JWEATHER | Approved | ECO CLEARED PER C. RUIZ |
05/13/2008 | MECHANICAL - FINAL | RFREIDIN | Approved | IVRS - Inspection :* |
05/13/2008 | PLUMBING - GAS PRESS TEST FNL | RFREIDIN | Approved | IVRS - Inspection :* |
05/13/2008 | ELECTRIC - FINAL | RFREIDIN | Approved | IVRS - Inspection :* |
05/13/2008 | BUILDING - FINAL | RFREIDIN | Approved | IVRS - Inspection :* |
05/14/2008 | STEM WALL/RETAINING WALL | RFREIDIN | Approved | |
05/14/2008 | PLUMBING - FINAL | RFREIDIN | Approved | IVRS - Inspection :* |