Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T06CM00757
Permit Details
Apply Date:
02/06/2006
Applicant:
BURLINI SILBERSCHLAG LTD
Description:
TI:DENTAL OFFICE 58' x 47'-8" SPACE, METAL STUDS W/ GYP BD
Contractors:
- RIO WEST DEVELOPMENT AND CONSTRU
Permit Reviews
Permit Number - T06CM00757
Permit Status: C of o
Permit Description: TI:DENTAL OFFICE
58' x 47'-8" SPACE, METAL STUDS W/ GYP BD
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/06/2006 | PLANS OK TO SUBMIT - COMM | 03/21/2006 | COMPLETED |
03/22/2006 | 3RD PARTY REVIEW-COMMERCIAL TI | 05/24/2006 | COMPLETED |
05/24/2006 | POST 3RD PARTY REVIEW | 06/01/2006 | COMPLETED |
06/01/2006 | RESUBMITTAL | 06/02/2006 | COMPLETED |
07/14/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 11/16/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM00757
Permit Status: C of o
Permit Description: TI:DENTAL OFFICE
58' x 47'-8" SPACE, METAL STUDS W/ GYP BD
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
02/06/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T06CM00757
Permit Description: TI:DENTAL OFFICE
58' x 47'-8" SPACE, METAL STUDS W/ GYP BD
Total Completed Inspections - 27
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/20/2006 | PLUMBING - MD GAS/PRECONST MTG | RMYERS | Approved | IVRS - Inspection :* 1. RIO WEST ARIZONA PROFESSIONAL PLUMBING CITY OF TUCSON CACTUS MEDICAL ABSENT 2. REVIEWED WITH G.C REQUIREMENTS FOR MED. GAS INSPECTIONS. 3. CALL 03045 FOR VACUUM UNDERGROUND. |
06/28/2006 | ELECTRIC - UNDERGROUND | RSUBA | Approved | IVRS - Inspection :* 1) ALL DENTAL FEEDS COMPLETE 2) 2-2" FOR PANEL (PANELS) |
07/07/2006 | BUILDING PRE-SLAB | JBURGE | Approved | IVRS - Inspection :* |
07/11/2006 | PLUMBING - PRE SLAB | RMYERS | Approved | 1. PRE-SLAB OK COPPER WRAPPED PVC WRAPPED READY FOR CONCRETE |
08/09/2006 | FRAMING | JBURGE | Approved | IVRS - Inspection :* OK TO SHEETROCK ONE SIDE |
08/15/2006 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection :* OK TO COVER HARD LIDS. |
08/28/2006 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* OK TO TAPE PLEASE ENSURE THAT ALL PENETRATIONS IN DEMISING WALL ARE PROPERTY FIRE CAULKED. *MEN'S RESTROOM #124 (REMINDER) WASTE PIPE NEEDS TO BE CORRECTED INCORRECT DISTANCE FROM WALL. |
09/15/2006 | PLUMBING - ABOVE CEILING | BBENEDON | Approved | IVRS - Inspection :* |
09/15/2006 | PLUMBING - INTERMEDIATE | BBENEDON | Approved | IVRS - Inspection :* |
09/20/2006 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* OK FOR CEILING TILES. LEAVE OUT AROUND DUCT SMOKE DETECTORS. WILL CHECK DETECTORS ON FINAL. |
09/20/2006 | BUILDING ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* T-BAR GRID SYSTEM & FRAMING FOR TRACK LIGHTING SYSTEM (OK TO SET TILES) |
09/25/2006 | FIRE - FINAL | LTHOMAS | Approved | |
09/26/2006 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
09/28/2006 | RIGHT OF WAY - FINAL | PWHIDDON | Approved | PER EMAIL |
10/25/2006 | TEP CLEARANCE - AM | BFLORES | Approved | ECO PER R.SUBA STE. #130 |
10/25/2006 | ELECTRIC - TEMP POWER FOR TEST | RSUBA | Approved | IVRS - Inspection :* |
10/25/2006 | ELECTRIC - INTERMEDIATE | RSUBA | Approved | IVRS - Inspection :* |
10/30/2006 | LANDSCAPE - FINAL | ACONNOR | Approved | |
11/06/2006 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
11/17/2006 | ENGINEERING - FINAL | JFEMLING | Approved | Item # 5 and 7 from 11/14/06 inspection satisfied by sign contract from sub to install within 30 days. |
11/20/2006 | PLUMBING - ROUGH, SOIL | BBENEDON | Approved | IVRS - Inspection :* |
11/20/2006 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :* |
11/20/2006 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* |
11/21/2006 | PLUMBING - MEDICAL GAS/TEST | BBENEDON | Approved | IVRS - Inspection :* |
11/22/2006 | PLUMBING - FINAL | BBENEDON | Approved | IVRS - Inspection :* |
11/22/2006 | PLUMBING - MEDICAL GAS/FINAL | BBENEDON | Approved | IVRS - Inspection :* |
11/22/2006 | ELECTRIC - FINAL | RSUBA | Approved | IVRS - Inspection :* |