Permit: T06BU02535
Permit Details
Apply Date:
10/23/2006
Applicant:
CONESTOGA ROVERS AND ASSOCIATES INC
Description:
GRADING:
Contractors:
- CONESTOGA ROVERS AND ASSOCIATES INC
Permit Reviews
Permit Number - T06BU02535
Permit Status: Expired
Permit Description: GRADING:
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/09/2007 | RESUBMITTAL - GRADING | 05/18/2007 | COMPLETED |
05/18/2007 | RESUBMITTAL - GRADING | 07/02/2007 | COMPLETED |
06/05/2008 | REVISION - GRADING | 12/30/2008 | COMPLETED |
10/23/2006 | PLANS OK TO SUBMIT - GRADING | 10/23/2006 | COMPLETED |
10/23/2006 | GRADING | 11/30/2006 | COMPLETED |
12/13/2006 | RESUBMITTAL - GRADING ALL | 01/18/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06BU02535
Permit Status: Expired
Permit Description: GRADING:
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
10/23/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
12/20/2006 | LANDSCAPE INSPECTOR MUST CHECK FENCING OF NATURAL AREAS PRIOR TO GRUBBING OR GRADING. |
12/20/2006 | LANDSCAPE INSPECTION REQUIRED BEFORE FINAL INSPECTION. |
06/15/2007 | The following 12 conditions apply to grading permit T06BU02535: 1) Call for Pre-construction meeting, intermediate and final inspections. For a DSD Engineering Inspection, call IVR (740-6970), or contact DSD Engineering at 837-4991, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2) During onsite Pre-construction meeting and after any rain events, any special or more specific interim sediment and erosion control measures shall be determined and implemented for control of stormwater runoff from the landscape and gantry construction areas to minimize potential adverse impact to the Railroad Wash. Field adjustments to the SWPPP shall also be considered throughout the monsoon season. All SWPPP reports shall be prepared and kept onsite and made available to City of Tucson DSD Inspectors. 3) A copy of the Grading Plan and Grading Permit shall be kept at the site at all times, until final grading approval. 4) See also floodplain use permit T06OT02735 which is issued concurrently with the grading permit T06BU02535. All work shall conform to the approved Grading, Drainage & Site plan for Union Pacific Railroad Gantry Crane Rail Project, activity number T06BU02535, by Conestoga-Rovers & Associates (dated 2-8-07), drainage report: Union Pacific Railroad Company Proposed Gantry Crane Rail Project Tucson Rail Yard Watercourse, Amenities, Safety, and Habitat / Environmental Resources Report (May 17, 2007), and Ninyo & Moore Geotechnical Evaluation Report (dated 9-8-06) with any addenda, which is made part of this permit. 5) Any revision to the Grading Plan may require a re-submittal of a revised grading plan for review. Contact DSD Engineering at 791-5550 to discuss changes in grading design. 6) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required. 7) Separate building permit applications are required for any walls or other structures. 8) Call for DSD Engineering Inspection of toedowns or other below-grade constructed structures prior to backfill. 9) The permitee shall notify the DSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. 10) Prior to request for final inspection approval, any outstanding fees shall be paid. 11) There shall be no disturbance outside of the disturbance/grading limits, and no grading shall begin until all required SWPPP controls are installed. There shall be NO stockpiling within the Railroad Wash which runs along the southwest side of the project. There shall be NO disturbance within the Railroad Wash or W.A.S.H. 50-foot Study Area except that which is specified on the approved plans. Disturbance limits shall be adhered to as shown on the approved plans. Any disturbance activity outside of the limits shall be subject to notice of violation, Stop Work Order, citation, and/or other penalties. 12) Contact Permits and Codes (791-5100) for any questions regarding any right-of-way permit requirements. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T06BU02535
Permite Description: GRADING:
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/09/2008 | GRADING - FINAL | N/A | Partial Approval | Contractor provided site cert from engineer. |
12/20/2007 | STORMWATER FOLLOW-UP INSP | N/A | Partial Approval | Met on site with landscaper, went over SWPPP issues and grading requirements. |
Completed Inspections
Permit Status: Expired
Permit Number: T06BU02535
Permit Description: GRADING:
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/04/2007 | STORMWATER INSTALL OF CONTROLS | MAVERY | Approved | Contractor needs to install gravel pad on west side of project, where silt fencing ends. |
09/04/2007 | ENGINEERING PRE-CONSTRUCTION | MAVERY | Approved | Completed pre-con with Jim McCaslin, project manager for CXT. |
05/13/2008 | LANDSCAPE INSPECTION | ACONNOR | Approved |