Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/16/2011 | GRADING - FINAL | Continued | NO WORK BEING DONE AT THIS TIME. | |
12/09/2008 | GRADING - FINAL | Partial Approval | Contractor provided site cert from engineer. | |
08/22/2008 | GRADING - FINAL | Partial Approval | Picture taken of site. Silt building up in silt basin. | |
07/08/2008 | GRADING - FINAL | Partial Approval | Railroad un-covered end of pipe. Install silt basin at end. | |
07/07/2008 | GRADING - FINAL | Partial Approval | Intersection of Fairland and Edmondsons flooding. Storm pipe that discharges into railroad wash blocked. Found end of pipe in wash un-covered it and water flowed out of intersection. | |
05/19/2008 | GRADING - FINAL | Partial Approval | Contractor needs to: 1- Remove debris from set-back a long wash. 2- Clean wash out near walking bridge next to backflow preventer. 3- Remove old planters next to box culvert. 4- Clean all wash out west end of rail. 5- Provide letter from engineer per 11-01.16.1.D, statement of conformance to spec. 6- Provide header curb from new bridge to existing asphalt. |
|
04/15/2008 | GRADING - FINAL | Correction Required | Contractor needs to: 1- Stabilize all areas disturbed by construction. 2- Install cutoff wall to right-of-way. |
|
03/19/2008 | GRADING - FINAL | Not ready for Inspection | Met on site with Bill from Demo unlimited, went over landscape drawings with Bill, Andy, Joe and Jim. |