Permit: T06BU02535

Parcel: 130010050


Addresses:

2501 E FAIRLAND SV


Inspection Status: Continued

Inspection History: GRADING - FINAL

Permit Number - T06BU02535

Inspection Description - GRADING - FINAL

Inspection Status - Continued

Date Description Inspector Results Comments
03/16/2011 GRADING - FINAL Continued NO WORK BEING DONE AT THIS TIME.
12/09/2008 GRADING - FINAL Partial Approval Contractor provided site cert from engineer.
08/22/2008 GRADING - FINAL Partial Approval Picture taken of site. Silt building up in silt basin.
07/08/2008 GRADING - FINAL Partial Approval Railroad un-covered end of pipe. Install silt basin at end.
07/07/2008 GRADING - FINAL Partial Approval Intersection of Fairland and Edmondsons flooding. Storm pipe that discharges into railroad wash blocked. Found end of pipe in wash un-covered it and water flowed out of intersection.
05/19/2008 GRADING - FINAL Partial Approval Contractor needs to:
1- Remove debris from set-back a long wash.
2- Clean wash out near walking bridge next to backflow preventer.
3- Remove old planters next to box culvert.
4- Clean all wash out west end of rail.
5- Provide letter from engineer per 11-01.16.1.D, statement of conformance to spec.
6- Provide header curb from new bridge to existing asphalt.
04/15/2008 GRADING - FINAL Correction Required Contractor needs to:
1- Stabilize all areas disturbed by construction.
2- Install cutoff wall to right-of-way.
03/19/2008 GRADING - FINAL Not ready for Inspection Met on site with Bill from Demo unlimited, went over landscape drawings with Bill, Andy, Joe and Jim.