Permit: T06BU00830
Permit Details
Apply Date:
04/05/2006
Applicant:
JEFFREY A STANLEY
Description:
GRADING: CUT 500 FILL 500
Contractors:
- DIVISION II CONSTRUCTION COMPANY
Permit Reviews
Permit Number - T06BU00830
Permit Status: Final
Permit Description: GRADING: CUT 500 FILL 500
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/28/2011 | RESUBMITTAL - GRADING ALL | 02/28/2011 | ACTIVE |
03/13/2009 | REVISION - GRADING | 03/13/2009 | COMPLETED |
03/13/2009 | REVISION - GRADING | 04/09/2009 | COMPLETED |
03/29/2010 | REVISION - GRADING | 04/06/2010 | COMPLETED |
04/05/2006 | PLANS OK TO SUBMIT - GRADING | 04/05/2006 | COMPLETED |
04/05/2006 | GRADING | 05/16/2006 | COMPLETED |
04/09/2009 | REVISION - GRADING | 04/10/2009 | COMPLETED |
08/23/2010 | REVISION - GRADING | 08/24/2010 | COMPLETED |
09/06/2006 | RESUBMITTAL - GRADING ALL | 11/14/2006 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T06BU00830
Permit Description: GRADING: CUT 500 FILL 500
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/11/2009 | GRADING - CHECK FOR ACTIVITY | JFEMLING | Approved | No activity |
10/15/2009 | LANDSCAPE INSPECTION | ACONNOR | Approved | Complete site and landscape work per plan. |
10/30/2009 | ENGINEERING PRE-CONSTRUCTION | JFEMLING | Approved | Pre-con with Division II Construction, site super Terry Pate 465-7151, discussed SWPPP, truncated dome placement, drainage and phaseing plan. |
11/02/2009 | NPPO PRE PERMIT INSPECTION | JLINVILLE | Approved | |
11/09/2009 | STORMWATER INSTALL OF CONTROLS | JFEMLING | Approved | Controls install as well as construction entrance. |
12/16/2009 | GRADING - INTERMEDIATE | JFEMLING | Approved | Contractor rough grading site and building pad. Had to shift building about 5ft to the west to avoid easement, will submit a revised plan. |
12/21/2010 | STORMWATER FOLLOW-UP INSP | JFEMLING | Approved | Contractor can remove all silt fence primeter stabilization is complete. |
12/21/2010 | GRADING - FINAL | JFEMLING | Approved | Complete the following prior to C of O Provide an as-built drawing showing all changes to the site provide an Eng. cert for the storm basins seperate all const. activity from public remove all construction debris from parking area stabilize all distrubed areas provide holes at dumpster gates to hold open finish all LS |
03/11/2011 | GRADING - TIER REV | JFEMLING | Approved | |
03/11/2011 | STORMWATER FINAL INSPECTION | JFEMLING | Approved | Approved |