Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 03/11/2011 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
Approved |
| 12/21/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Contractor can remove all silt fence primeter stabilization is complete. |
| 11/29/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Controls look good, pavement down so less concerns with erosion |
| 10/05/2010 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Controls in good shape, I told contractor that the garbage blowwing around the site needed to be picked up and placed in a dumpster. |
| 03/04/2010 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Need to repair one area on primeter where silt fence fell. |
| 01/21/2010 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Minor track out , primeter controls in good shape. |
| 12/16/2009 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
All controls installed and in good cond. |