Permit Details

Status:
Final
Type:
SINGLE FAMILY OTHER
Apply Date:
10/21/2005
Applicant:
PRESIDIO ELECTRIC SERVICES INC,*C
Description:
REPLACE 200 AMP
Contractors:
  • PRESIDIO ELECTRIC SERVICES INC,*C

Outstanding Activity Conditions

Permit Number - T05EL02163
Permit Status: Final
Permit Description: REPLACE 200 AMP
Total Outstanding Activity Conditions - 1
Date Name
10/21/2005 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T05EL02163
Permit Description: REPLACE 200 AMP
Total Completed Inspections - 2
Date Description Inspector Results Comments
12/14/2005 ELECTRIC - FINAL CCLEMENS Approved IVRS - Inspection :
The service is not per code.| 210$
1. PROPERLY STRAP CONDUITS ENTERING PANEL - NEC 344.30(A) AND NEC 358.30(A)
2. WHERE THOSE CONDUITS ARE USED AS AN EQUIPMENT - GROUND, MAKE SURE THEY ARE MADE UP TIGHT AND PROVIDE A PROPER GROUND PATH NEC 250.4(A)5
3. BOND WATER AND GAS PIPES TO SERVICE - NEC 250.104(A) AND (B)
4. INSTALL SEALING TYPE LOCKNUTS WHERE A.C. L.B. ENTERS PANEL ON SIDE OF ENCLOSURE NEC 110.11
5. MARK SERVICE DISCONNECT ON PANEL NEC 110.22
07/24/2006 PERMIT FINALED LJACKSON Approved