Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
301 S PARK AV
Apply Date:
08/16/2005
Applicant:
URS CORPORATION
Description:
MULTI-PHASE EXTRACTION REMEDIATION SYSTEM FOR MISSION LINEN SUPPLY SITE: PROJECT PURPOSE REMEDIATE CHLORINATED SOLVENT AND PETROLEUM HYDROCARBON CONTAMINATION IN SUBSURFACE SOIL AND GROUNDWATER BENEATH THIS FACILITY; - 6500 GALLON TREATED WATER STORAGE TANK, INCLUDING FOUNDATION. - 4 - INTERIOR WELL HEAD VAULTS, INCLUDING VAULT COVER. - 2 - EXTERIOR WELL HEAD VAULTS, INCLUDING VAULT COVER. - 1 - DISCHARGE STACK. - SECONDARY CONTAINMENT FOR INDOOR CONTROL AREA, INCLUDING CURB AND SEALING OF FLOOR SLAB.
Contractors:
  • ENVIRONMENTAL RESPONSE INC ,

Permit Reviews

Permit Number - T05CM04285
Permit Status: Final
Permit Description: MULTI-PHASE EXTRACTION REMEDIATION SYSTEM FOR MISSION LINEN SUPPLY SITE: PROJECT PURPOSE REMEDIATE CHLORINATED SOLVENT AND PETROLEUM HYDROCARBON CONTAMINATION IN SUBSURFACE SOIL AND GROUNDWATER BENEATH THIS FACILITY; - 6500 GALLON TREATED WATER STORAGE TANK, INCLUDING FOUNDATION. - 4 - INTERIOR WELL HEAD VAULTS, INCLUDING VAULT COVER. - 2 - EXTERIOR WELL HEAD VAULTS, INCLUDING VAULT COVER. - 1 - DISCHARGE STACK. - SECONDARY CONTAINMENT FOR INDOOR CONTROL AREA, INCLUDING CURB AND SEALING OF FLOOR SLAB.
Start Date Submittal Complete Date Status  
02/11/2008 REVISION - - 1ST 02/11/2008 COMPLETED Review Details
03/13/2006 RESUBMITTAL 03/29/2006 COMPLETED Review Details
03/29/2006 RESUBMITTAL 04/27/2006 COMPLETED Review Details
08/16/2005 OTHER 09/13/2005 COMPLETED Review Details
09/19/2005 RESUBMITTAL 10/18/2005 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T05CM04285
Permit Status: Final
Permit Description: MULTI-PHASE EXTRACTION REMEDIATION SYSTEM FOR MISSION LINEN SUPPLY SITE: PROJECT PURPOSE REMEDIATE CHLORINATED SOLVENT AND PETROLEUM HYDROCARBON CONTAMINATION IN SUBSURFACE SOIL AND GROUNDWATER BENEATH THIS FACILITY; - 6500 GALLON TREATED WATER STORAGE TANK, INCLUDING FOUNDATION. - 4 - INTERIOR WELL HEAD VAULTS, INCLUDING VAULT COVER. - 2 - EXTERIOR WELL HEAD VAULTS, INCLUDING VAULT COVER. - 1 - DISCHARGE STACK. - SECONDARY CONTAINMENT FOR INDOOR CONTROL AREA, INCLUDING CURB AND SEALING OF FLOOR SLAB.
Total Outstanding Activity Conditions - 1
Date Name
08/16/2005 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T05CM04285
Permit Description: MULTI-PHASE EXTRACTION REMEDIATION SYSTEM FOR MISSION LINEN SUPPLY SITE: PROJECT PURPOSE REMEDIATE CHLORINATED SOLVENT AND PETROLEUM HYDROCARBON CONTAMINATION IN SUBSURFACE SOIL AND GROUNDWATER BENEATH THIS FACILITY; - 6500 GALLON TREATED WATER STORAGE TANK, INCLUDING FOUNDATION. - 4 - INTERIOR WELL HEAD VAULTS, INCLUDING VAULT COVER. - 2 - EXTERIOR WELL HEAD VAULTS, INCLUDING VAULT COVER. - 1 - DISCHARGE STACK. - SECONDARY CONTAINMENT FOR INDOOR CONTROL AREA, INCLUDING CURB AND SEALING OF FLOOR SLAB.
Total Completed Inspections - 9
Date Description Inspector Results Comments
12/13/2007 EXCAVATION/LAYOUT REBAR & ZON LHANLY Approved IVRS - Inspection :*
EXTERIOR WELL VAULTS PER DETAIL 5 PP S-1
03/28/2008 ELECTRIC - INTERMEDIATE DSANTACR Approved IVRS - Inspection :*
03/28/2008 TEP CLEARANCE - AM JWEATHER Approved TEC CLEARED FOR "ENVIROMENTAL METER" PER D. SANTACRUZ
04/08/2008 FRAMING GDABBS Approved IVRS - Inspection :*
04/08/2008 BUILDING PRE-SLAB GDABBS Approved IVRS - Inspection :*
04/08/2008 STEM WALL/RETAINING WALL GDABBS Approved IVRS - Inspection :*
04/10/2008 ELECTRIC - FINAL DSANTACR Approved IVRS - Inspection :*
04/11/2008 BUILDING - FINAL GDABBS Approved IVRS - Inspection :*
04/15/2008 FIRE - FINAL CSCHULTZ Approved FOR MULTI-PHASE EXTRACTION UNIT ONLY.

Documents

File Name Document Type  
T05CM04285_001.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW