Permit: T05CM00867
Permit Details
Apply Date:
02/25/2005
Applicant:
PANNO, THOMAS PATRICK
Description:
TI: MEDICAL OFFICE
Architects:
- PANNO, THOMAS PATRICK
Contractors:
- DIVERSIFIED DESIGN AND CONSTRUCT
Permit Reviews
Permit Number - T05CM00867
Permit Status: C of o
Permit Description: TI: MEDICAL OFFICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/19/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 01/23/2006 | COMPLETED |
| 02/02/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 02/21/2006 | COMPLETED |
| 02/25/2005 | PLANS OK TO SUBMIT - 3RD PARTY | 02/25/2005 | COMPLETED |
| 02/25/2005 | 3RD PARTY REVIEW-COMMERCIAL TI | 03/30/2005 | COMPLETED |
| 03/30/2005 | POST 3RD PARTY REVIEW | 04/07/2005 | COMPLETED |
| 04/13/2005 | RESUBMITTAL | 04/13/2005 | COMPLETED |
| 05/03/2005 | 3RD PARTY REVIEW-REVISION/OTHER | 05/10/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM00867
Permit Status: C of o
Permit Description: TI: MEDICAL OFFICE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/25/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T05CM00867
Permit Description: TI: MEDICAL OFFICE
Total Completed Inspections - 29
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2005 | ELECTRIC - UNDERGROUND | RMAJUTA | Approved | IN SLAB OK TO COVER |
| 05/12/2005 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | IVRS - Inspection :* |
| 06/10/2005 | STEM WALL/RETAINING WALL | LHANLY | Approved | IVRS - Inspection :* |
| 06/15/2005 | REINFORCED MASONRY PRE-GROUT | LHANLY | Approved | IVRS - Inspection :* |
| 08/17/2005 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection :* 1) EPOXIED BOLT REPORTS REVISED/OK |
| 08/22/2005 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
| 08/23/2005 | FIRE - FINAL | LTHOMAS | Approved | |
| 08/28/2005 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :* 1) OK TO TILE EXCEPT AS NOTED 2) FINISH ITEMS 3 AND 4 OF PREVIOUS INSPECTION |
| 08/29/2005 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* 1) OK FOR CEILING TILES |
| 08/30/2005 | ELECTRIC - SERVICE UPGRADE | RSUBA | Approved | IVRS - Inspection :* |
| 08/30/2005 | TEP CLEARANCE - AM | RMAJUTA | Approved | OK ECO PER SUBA |
| 09/14/2005 | PLUMBING - GAS PRESSURE TEST | RRICH | Approved | 1) 60 PSI TEST FROM METER TO (4) ROOF TOP UNITS OK |
| 09/14/2005 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* |
| 09/20/2005 | RIGHT OF WAY - FINAL | NKALAHAR | Approved | PER EMAIL |
| 09/20/2005 | ENGINEERING - FINAL | DROBERTS | Approved | TRUNCATED DOMES ARE A CURRENT REQUIREMENT FOR ALL WHEELCHAIR ACCESS RAMPS, AND MAY HAVE TO BE INSTALLED IN THE FUTURE. |
| 09/22/2005 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* 1) PERMANENTLY IDENTIFY A/C UNITS 2) SECURE ELECTRIC DISCONNECTS 3) TIGHTEN LOOSE ELECTRIC FITTING ON A/C-3 4) LEFT GAS CARD 5) OK FOR TEMP C OF O FOR SECTION A PA ROOMS #59-64 WILL REQUIRE BUILD OUT. BECAUSE OF REVISION PENDING. ALL OTHER AREAS OF BUILDING NO PROBLEMS FOR TEMP C OF O |
| 09/22/2005 | PLUMBING - GAS PRESS TEST FNL | RRICH | Approved | IVRS - Inspection :* |
| 09/27/2005 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :*OK FOR FINAL C OF O IN A BLDG ONLY |
| 09/27/2005 | ELECTRIC - FINAL | RSUBA | Approved | FOR TEMP C/O |
| 09/27/2005 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* SOUTH END OF BUILDING AND ALL BUILDING ROUGH OK |
| 10/11/2005 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
| 10/18/2005 | BUILDING PRE-SLAB | LHANLY | Approved | IVRS - Inspection :*OK TO PLACE CONCRETE WHEN ELC INSP. SIGNS OFF UNDERGROUND. |
| 10/18/2005 | STUCCO MESH | LHANLY | Approved | IVRS - Inspection :* |
| 10/26/2005 | BUILDING - FINAL | LHANLY | Approved | PARTIAL OK TCO NORTH WING |
| 11/07/2005 | ELECTRIC - TEMPORARY SERVICE | RHOLLAND | Approved | IVRS - Inspection :*OK 1-4" PVC CONDUIT SERVICE TO TRANSFORMER OK 2 GROUND PODS & 3/0 COPPER FOR TRANSFORMER |
| 12/29/2005 | FRAMING | LHANLY | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1. KEY NOTE 47 PO A-1 2. INCOMPLETE PLANS WHERE'S PP A-13? 3. PROVIDE SP. INSP. REPORTS FOR WELDS AND EPOXY BOLTING |
| 12/29/2005 | PLUMBING - INTERMEDIATE | TRINIVJR | Approved | IVRS - Inspection :*DWV WATER TEST OK OVERHEAD WATER DISTRIBUTION IS OK |
| 12/29/2005 | ELECTRIC - INTERMEDIATE | RSUBA | Approved | |
| 01/25/2006 | TEP CLEARANCE - PM | JWEATHER | Approved | CLEAR ECO PER R. SUBA FOR B(X-RAY) |