Permit: T05BU02585
Permit Details
Apply Date:
10/24/2005
Applicant:
SWAIM ASSOCIATES, LTD
Description:
GRADING:500 CY CUT & 0 FILL
Contractors:
- LLOYD CONSTRUCTION COMPANY INC ,
Permit Reviews
Permit Number - T05BU02585
Permit Status: Final
Permit Description: GRADING:500 CY CUT & 0 FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/18/2006 | REVISION - GRADING | 10/18/2006 | COMPLETED |
| 10/24/2005 | PLANS OK TO SUBMIT - GRADING | 10/25/2005 | COMPLETED |
| 10/25/2005 | GRADING | 12/06/2005 | COMPLETED |
| 12/12/2005 | RESUBMITTAL - GRADING ALL | 12/12/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05BU02585
Permit Status: Final
Permit Description: GRADING:500 CY CUT & 0 FILL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/24/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T05BU02585
Permit Description: GRADING:500 CY CUT & 0 FILL
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2006 | ENGINEERING PRE-CONSTRUCTION | JBRUCKME | Approved | PRE-CONSTRUCTION MEETING WITH JASON MEJIAS THE GENERAL SUPERINTENDENT FOR LLOYD CONSTRUCTION. 1. PROVIDE AZPDES POSTING SIGN AT THE ENTRANCE. 2. PROVIDE A COPY OF THE AZPDES AUTHOURIZTION FORM. 3. PROVIDE SIGNED COPIES OF THE SUB-CONTRACTOR CERTIFICATION FOR THE GRADING CONTRACTOR. 4. INSTALL SILT FENCE AND CALL FOR INSPECTION FOR INSTALLATION OF SWPPP CONTROLS. |
| 01/09/2006 | STORMWATER INSTALL OF CONTROLS | JBRUCKME | Approved | |
| 09/29/2006 | GRADING - FINAL | JBRUCKME | Approved | NOT READY FOR FINAL GRADING INSPECTION SEE INTERMEDIATE GRADING INSPECTION NOTES. |
| 10/04/2006 | GRADING - INTERMEDIATE | JBRUCKME | Approved | I MET WITH FRED FERRO AND JOHN/VERDE LANDSCAPING IN REGARDS TO THE STORMWATER HARVEST AREAS. SITE CHECK FOR CONSTRUCTION FENCE PARTIALLY IN PLACE. TEMPORARY PEDESTRIAN WALKWAY IN PLACE AT THIS TIME. |
| 12/12/2006 | STORMWATER FOLLOW-UP INSP | JBRUCKME | Approved | 1. REMOVE SEDIMENT THAT HAS ACCUMALATED AGAINST THE SEDIMENT LOG ON WEST PERIMETER. 2. REMOVE SOIL AND SEDIMENT ON THE RIVER BANK WALKWAY ON THE WEST PERIMETER. 3. CLEAN UP CONCRETE WASH OUT ON BOTH SIDES OF TRASH ENCLOSURE. PROVIDE SEDIMENT AND EROSION CONTROL AT THE CATCH BASIN INLET ON THE NW CORNER OF THE SITE. |
| 05/29/2007 | STORMWATER FINAL INSPECTION | JBRUCKME | Approved | |
| 05/29/2007 | LANDSCAPE INSPECTION | ACONNOR | Approved | |
| 05/29/2007 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
| 06/08/2007 | PERMIT FINALED | BGRANT | Approved |