Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/29/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 03/05/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | REMOVE SEDIMENT DISCHARGED INTO PANTANO WASH FROM DRIVEWAY CLEANING OPERATIONS. | |
| 02/22/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 01/30/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 12/12/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REMOVE SEDIMENT THAT HAS ACCUMALATED AGAINST THE SEDIMENT LOG ON WEST PERIMETER. 2. REMOVE SOIL AND SEDIMENT ON THE RIVER BANK WALKWAY ON THE WEST PERIMETER. 3. CLEAN UP CONCRETE WASH OUT ON BOTH SIDES OF TRASH ENCLOSURE. PROVIDE SEDIMENT AND EROSION CONTROL AT THE CATCH BASIN INLET ON THE NW CORNER OF THE SITE. |
|
| 09/27/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
| 08/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SWEEP DIRT IN PUBLIC R.O.W./SPEEDWAY FRONTAGE. | |
| 08/02/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REMOVE SEDIMENT ACCUMALATION BEHIND SILT LOG AND BREAK OUT OVER BICYCLE PATH. 2. CLEAN MUD FROM PUBLIC RIGHT OF WAY. |
|
| 06/23/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | CONTRACTOR HAS COMPLETED WORK IDENTIFIED ON CORRECTION NOTICE. SITE IS IN GOOD CONDITION. | |
| 06/22/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | I ISSUED A CORRECTION NOTICE TO FRED FERRO FOR COMPLIANCE WITHIN (4) DAYS, NON COMPLIANCE WILL RESULT IN A STOP WORK ORDER AND NOTICE OF VIOLATION. 1. REMOVE DIRT RAMP ON SPEEDWAY. 2. PROVIDE A 30' X 50' STABILIZED CONSTRUCTION ENTRANCE OF 1-3" ROCK. |
|
| 06/07/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REMOVE DIRT RAMP ON SPEEDWAY AND PROVIDE A 30' X 50' STABILIZED CONSTRUCTION ENTRANCE OF 1-3" ROCK. 2. PROVIDE WATER FOR DUST CONTROL. DIRT SURFACES MUST HAVE A CRUST TO PREVENT BLOWING DUST. SITE MUST BE KEPT WATERED. 3. REPAIR SEDIMENT SOCK AT TWO LOCATIONS ON THE PERIMETER. 4. PREPARE A SWPPP REPORT EVERY (2) WEEKS AND KEEP RECORDS ON SITE. MET WITH FRED/LLOYD'S CONSTR. 471-2504 |
|
| 02/03/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS |