Permit: T05BU01167
Permit Details
Apply Date:
05/12/2005
Applicant:
N/A
Description:
GRADING
Contractors:
- D P R CONSTRUCTION INC ,
Permit Reviews
Permit Number - T05BU01167
Permit Status: Final
Permit Description: GRADING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/12/2005 | PLANS OK TO SUBMIT - GRADING | 05/12/2005 | COMPLETED |
05/12/2005 | GRADING | 06/09/2005 | COMPLETED |
07/17/2006 | REVISION - GRADING | 07/20/2006 | COMPLETED |
07/18/2005 | RESUBMITTAL - GRADING | 08/03/2005 | COMPLETED |
08/10/2005 | RESUBMITTAL - GRADING | 08/15/2005 | COMPLETED |
08/16/2005 | RESUBMITTAL - GRADING | 08/18/2005 | COMPLETED |
11/30/2005 | REVISION - GRADING | 12/13/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05BU01167
Permit Status: Final
Permit Description: GRADING
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/12/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T05BU01167
Permit Description: GRADING
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/18/2005 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | |
10/27/2005 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | 1) ENSURE STORM WATER CONTROL MAINT INSPECTIONS ARE PERFORMED AND DOCUMENTED AS STATED IN YOUR SWPPP. 2) REPAIR AND/OR REPLACE ANY DAMAGED OR FALLEN DOWN STORM WATER CONTROLS. 3) IF SEDIMENT CONTROLS ARE REQUIRED TO BE REMOVED TEMPORARILY FOR SITE WORK, ENSURE THEY ARE REPLACED WHEN WORK IS COMPLETED. 4) SWEEP UP ANY TRACKED MATERIAL OFF OF PUBLIC ROADWAYS AS NECESSARY. 5) ENSURE A CONCRETE WASH OUT AREA IS USED AND INDENTIFIED. 6) KEEP ALL WASTE MATERIALS ON SITE UNTIL THEY CAN BE PROPERLY DISPOSED OF. |
12/09/2005 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | 1) REPAIR SILT FENCE ALONG THE EAST BOUNDRY. 2) REPAIRS ARE NEEDED ALONG THE WEST BOUNDRY, SECTIONS OF SILT FENCE MISSING ALONG THE WEST SIDE. 3) SWEEP UP THE ENTRANCE TO THE SITE ROUTINELY TO MINIMIZE DUST AND TRACKING OF MATERIAL OFF SITE. 4) ESTABLISH AND USE A CONCRETE WASH OUT AREA AS REQUIRED BY YOUR APPROVED STORM WATER POLLUTION PREVENTION PLAN (SWPPP). 5) PERFORM AND DOCUMENT STORM WATER CONTROLS MAINTENANCE INSPECTIONS AS REQUIRED BY YOUR SWPPP. FOLLOW UP COMPLIANCE INSPECTIONS IN 1 WEEK FROM DATE. |
02/06/2007 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | |
02/06/2007 | GRADING - INTERMEDIATE | MRUSSO | Approved | |
02/22/2007 | GRADING - FINAL | MRUSSO | Approved | ALL ITEMS LISTED ON THE 2/5/07 FINAL GRADING INSPECTION HAVE BEEN ADDRESSED. COPY OF ANY CHANGES TO THE APPROVED GRADING PLAN WILL BE KEPT IN ARCHIVE AND WILL BE SHOWN ON THE AS-BUILT. ALL CHANGES HAVE BEEN APPROVED BY THE REVIEW ENGINEER (JOSE ORTIZ). |
03/06/2007 | LANDSCAPE INSPECTION | ACONNOR | Approved |