Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T05BU01167
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2005 | STORMWATER INSTALL OF CONTROLS | Approved | 1) ENSURE STORM WATER CONTROL MAINT INSPECTIONS ARE PERFORMED AND DOCUMENTED AS STATED IN YOUR SWPPP. 2) REPAIR AND/OR REPLACE ANY DAMAGED OR FALLEN DOWN STORM WATER CONTROLS. 3) IF SEDIMENT CONTROLS ARE REQUIRED TO BE REMOVED TEMPORARILY FOR SITE WORK, ENSURE THEY ARE REPLACED WHEN WORK IS COMPLETED. 4) SWEEP UP ANY TRACKED MATERIAL OFF OF PUBLIC ROADWAYS AS NECESSARY. 5) ENSURE A CONCRETE WASH OUT AREA IS USED AND INDENTIFIED. 6) KEEP ALL WASTE MATERIALS ON SITE UNTIL THEY CAN BE PROPERLY DISPOSED OF. |
|
09/13/2005 | STORMWATER INSTALL OF CONTROLS | Partial Approval | 1) ENSURE ANY CHANGES TO THE SWPPP ARE APPROVED BY THE CITY OF TUCSON SITE INSPECTOR AND ARE DOCUMENTED ON THE PLAN. 2) ENSURE SW MAINT INSPECTIONS ARE ACCOMPLISHED PER PLAN AND ARE DOCUMENTED. 3) SWEEP UP ANY TRACKED SOIL ON TO PUBLIC ROADWAYS 4) CALL FOR RE-INSPECTION UPON COMPLETION OF THE INSTALLATION OF YOUR SEDIMENT CONTROLS. |