Permit: T05BU01005
Permit Details
Apply Date:
04/27/2005
Applicant:
N/A
Description:
GRADING: 1763 CUT 26959 FILL
Contractors:
- H S L CONSTRUCTION SERVICES L L C
Permit Reviews
Permit Number - T05BU01005
Permit Status: Issued
Permit Description: GRADING: 1763 CUT 26959 FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/27/2005 | PLANS OK TO SUBMIT - GRADING | 04/27/2005 | COMPLETED |
| 04/27/2005 | GRADING | 07/19/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05BU01005
Permit Status: Issued
Permit Description: GRADING: 1763 CUT 26959 FILL
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 04/27/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 05/25/2005 | LANDSCAPE INSPECTOR MUST CHECK FENCING OF NATURAL AREAS PRIOR TO GRUBBING OR GRADING. |
| 02/15/2006 | LANDSCAPE INSPECTION AND NPPO MONITORING REPORTS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T05BU01005
Permite Description: GRADING: 1763 CUT 26959 FILL
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| STORMWATER FINAL INSPECTION | N/A | Not Inspected | ||
| 09/15/2010 | GRADING - FINAL | N/A | Continued | NO CHANGES, NOT READY FOR FINAL |
| 12/14/2012 | GRADING - INTERMEDIATE | N/A | Continued | NO ACTIVITY, NO CHANGES. SITE NOT COMPLETE |
| 12/28/2006 | STORMWATER FOLLOW-UP INSP | N/A | Correction Required | ITEMS FROM THE PREVIOUS INSPECTION HAVE BEEN ADDRESSED. ENSURE CONTRACTORS USE THE EXISTING WASH OUT PROVIDED ON SITE. NO OTHER STORM WATER CONCERNS AT THIS TIME. |
Completed Inspections
Permit Status: Issued
Permit Number: T05BU01005
Permit Description: GRADING: 1763 CUT 26959 FILL
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2005 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | CONTACTED JASON BOYSEL OF PATHWAY DEVELOPMENT INC., HE STATED THAT THE PROJECT FOR RIO VISTA APPTS. WOULD NOT GET STARTED UNTIL FALL 2005. I GAVE HIM MY INFO AND TOLD HIM TO CALL FOR A PRECON MEETING PRIOR TO ANY GRADING ON THE SITE |
| 02/14/2006 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
| 03/06/2006 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | SEDIMENT CONTROLS HAVE BEEN INSTALLED PER SWPPP. ENSURE PERIODIC MAINT. INSPECTIONS ARE PERFORMED AND DOCUMENTED. SWEEP UP TRACKED MATERIAL ON A ROUTINE BASIS. |
| 02/17/2010 | LANDSCAPE INSPECTION | ACONNOR | Approved |