Permit Details

Status:
Final
Type:
SINGLE FAMILY OTHER
Address:
7931 E ELI PL
Address NEW:
7931 E ELI PL
Apply Date:
12/09/2004
Applicant:
RANGEL RAMON
Description:
new gas line from meter to home
Contractors:
  • SENOR ROOTER L L C *C

Outstanding Activity Conditions

Permit Number - T04PL02176
Permit Status: Final
Permit Description: new gas line from meter to home
Total Outstanding Activity Conditions - 1
Date Name
12/09/2004 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T04PL02176
Permit Description: new gas line from meter to home
Total Completed Inspections - 4
Date Description Inspector Results Comments
12/13/2004 PLUMBING - GAS PRESSURE TEST RRICH Approved IVRS - Inspection :* 14 PSI AIR TEST NOW 3/4 PE UNDERGROUND TO BUILDING SERVICE ENTRANCE TO WATER HEATER, FURNACE, DRYER & STOVE OK 3090 CORRECTION MADE GAS CARD AT METER
12/13/2004 PLUMBING - FINAL RRICH Approved IVRS - Inspection :*
12/13/2004 PLUMBING - GAS PRESSURE TEST RRICH Approved IVRS - Inspection :*/1)PROVIDE BONDING OF BUILDING GAS PIPING 2)PROVIDE 30" HORIZONTAL SCOTCH COAT PIPING AND SCOTCH COAT PIPING VERTICAL IN UNDERGROUND AT TRANSITION RISER OR APPROVED TRANSITION RISER 3)WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLE & COUPLING TO BE USED. 4)T&P DRAIN TO TERMINATE WITH 90 DEGREE DOWN 5)PROVIDE RIDGID PIPE PENETRATION THRU FURNACE APPLIANCE HOUSEING 6)VENT FROM FURNACE WHEN WITHIN 10' OF COOLER TO BE 2' ABOVE TOP OF COOLER INTAKE
05/03/2005 PERMIT FINALED LJACKSON Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW