Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 12/13/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :*/1)PROVIDE BONDING OF BUILDING GAS PIPING 2)PROVIDE 30" HORIZONTAL SCOTCH COAT PIPING AND SCOTCH COAT PIPING VERTICAL IN UNDERGROUND AT TRANSITION RISER OR APPROVED TRANSITION RISER 3)WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLE & COUPLING TO BE USED. 4)T&P DRAIN TO TERMINATE WITH 90 DEGREE DOWN 5)PROVIDE RIDGID PIPE PENETRATION THRU FURNACE APPLIANCE HOUSEING 6)VENT FROM FURNACE WHEN WITHIN 10' OF COOLER TO BE 2' ABOVE TOP OF COOLER INTAKE |
| 12/13/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* 14 PSI AIR TEST NOW 3/4 PE UNDERGROUND TO BUILDING SERVICE ENTRANCE TO WATER HEATER, FURNACE, DRYER & STOVE OK 3090 CORRECTION MADE GAS CARD AT METER |