Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T04CM05380
Permit Details
Apply Date:
12/14/2004
Applicant:
KAVOOSI MOHAMMAD H
Description:
ADDITION:BEDROOM/BATHROOM
Permit Reviews
Permit Number - T04CM05380
Permit Status: Final
Permit Description: ADDITION:BEDROOM/BATHROOM
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/10/2005 | REVISION - WALK THRU | 08/11/2005 | COMPLETED |
09/30/2005 | REVISION | 09/30/2005 | COMPLETED |
10/27/2005 | REVISION - WALK THRU | 10/27/2005 | COMPLETED |
10/28/2005 | REVISION - WALK THRU | 10/28/2005 | COMPLETED |
12/14/2004 | RESIDENTIAL BLDG/ZONING/ENGINE/WWM | 12/16/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04CM05380
Permit Status: Final
Permit Description: ADDITION:BEDROOM/BATHROOM
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/14/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04CM05380
Permit Description: ADDITION:BEDROOM/BATHROOM
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/15/2005 | PLUMBING - ROUGH, SOIL | ROHAVER | Approved | IVRS - Inspection :* |
04/27/2005 | BUILDING PRE-SLAB | EDURAZO | Approved | IVRS - Inspection :* |
04/27/2005 | EXCAVATION/LAYOUT REBAR & ZON | EDURAZO | Approved | IVRS - Inspection :* |
06/23/2005 | ROOF NAILING | DQUINN | Approved | IVRS - Inspection :* |
06/23/2005 | EXT METAL CLIPS/EXT SHEATHING | DQUINN | Approved | IVRS - Inspection :* |
08/09/2005 | FRAMING | RCAMACHO | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) BLOCK TUB WALLS 2) COMPLETE BREAK THROUGH TO KITCHEN 3) COMPLETE SOFFIT IN KITCHEN 4) PLAN CALLS FOR ELECTRIC WATER HEATER GAS LINE INSTALLED 5) FLEX LINE IN WALLS SHOULD BE BLACK IRON ON LEGGS CALLED FOR ON PLANS 6) PEX AND DWV SYSTEM OK |
08/09/2005 | U VALUE FOR WINDOW | RCAMACHO | Approved | IVRS - Inspection :* |
08/09/2005 | STUCCO MESH | RCAMACHO | Approved | IVRS - Inspection :* |
10/07/2005 | ELECTRIC - TEMPORARY SERVICE | RCAMACHO | Approved | IVRS - Inspection :* |
10/07/2005 | ELECTRIC - CABLE DROP | RCAMACHO | Approved | IVRS - Inspection :* |
10/10/2005 | TEP CLEARANCE - AM | JKOZUCH | Approved | |
10/12/2005 | ELECTRIC - INTERMEDIATE | RCAMACHO | Approved | |
10/12/2005 | ELECTRIC - SERVICE UPGRADE | RCAMACHO | Approved | IVRS - Inspection :* 1) LABEL CIRCUITS AT FINALS 2) NOTE: RECALL GAS PRESSURE TEST WITH GAUGE 10 POUND TEST |
10/24/2005 | SHEET ROCK NAILING | RCAMACHO | Approved | IVRS - Inspection :* 1) PARTIAL EXCEPT KITCHEN-DO NOT COVER KITCHEN 2) CHANGES MADE TO KITCHEN ELECTRICAL, GAS AND PLUMBING AFTER INTERMEDIATE INSPECTIONS 3) REVISIONS MUST BE SUBMITTED PRIOR TO INSPECTION. HAVE APPROVED INSPECTIONS CHANGED TO PARTIAL APPROVAL |
11/01/2005 | PLUMBING - GAS PRESSURE TEST | WNORTH | Approved | IVRS - Inspection :* 1) GAS LINE APPROVED PER CHANGED PLAN ON SITE |
11/04/2005 | PLUMBING - INTERMEDIATE | RCAMACHO | Approved | IVRS - Inspection :* |
03/01/2006 | PLUMBING - SEWER HCS CONNECT | WNORTH | Approved | IVRS - Inspection :* |
09/16/2008 | ZONING - FINAL | ACONNOR | Approved | |
10/06/2008 | ELECTRIC - FINAL | CRUIZ | Approved | IVRS - Inspection :* |
10/13/2008 | MECHANICAL - INTERMEDIATE | DWALKER | Approved | |
10/13/2008 | MECHANICAL - FINAL | DWALKER | Approved | IVRS - Inspection :* |
10/13/2008 | PLUMBING - FINAL | DWALKER | Approved | IVRS - Inspection :* |
10/13/2008 | BUILDING - FINAL | DWALKER | Approved | IVRS - Inspection :* |
10/14/2008 | PERMIT FINALED | JWEATHER | Approved |