Permit: T04CM01422
Permit Details
Apply Date:
03/26/2004
Applicant:
MENDOZA, FRANK M
Description:
ADDITION:MASTER BEDROOM/BATHROOM/FAMILY ROOM
Architects:
- MENDOZA, FRANK M
Permit Reviews
Permit Number - T04CM01422
Permit Status: Final
Permit Description: ADDITION:MASTER BEDROOM/BATHROOM/FAMILY ROOM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/26/2004 | PLANS OK TO SUBMIT - RES | 05/17/2004 | COMPLETED |
| 05/18/2004 | 3RD PARTY REVIEW-RESIDENTIAL | 06/17/2004 | COMPLETED |
| 06/17/2004 | POST 3RD PARTY REVIEW | 06/28/2004 | COMPLETED |
| 06/24/2019 | REVISION - - 2ND | 06/24/2019 | ACTIVE |
| 12/12/2017 | REVISION - - 1ST | 12/12/2017 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04CM01422
Permit Status: Final
Permit Description: ADDITION:MASTER BEDROOM/BATHROOM/FAMILY ROOM
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/26/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04CM01422
Permit Description: ADDITION:MASTER BEDROOM/BATHROOM/FAMILY ROOM
Total Completed Inspections - 28
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2004 | PLUMBING - ROUGH, SOIL | JRIVA | Approved | IVRS - Inspection :* |
| 01/20/2005 | ELECTRIC - UNDERGROUND | EDURAZO | Approved | IVRS - Inspection :* |
| 01/20/2005 | ELECTRIC - UFER | EDURAZO | Approved | IVRS - Inspection :* |
| 01/20/2005 | BUILDING PRE-SLAB | EDURAZO | Approved | IVRS - Inspection :* |
| 01/20/2005 | STEM WALL/RETAINING WALL | EDURAZO | Approved | IVRS - Inspection :* |
| 01/20/2005 | EXCAVATION/LAYOUT REBAR & ZON | EDURAZO | Approved | IVRS - Inspection :* |
| 07/19/2005 | BUILDING ABOVE CEILING | EDURAZO | Approved | IVRS - Inspection :* |
| 07/19/2005 | FRAMING | EDURAZO | Approved | IVRS - Inspection :* |
| 07/19/2005 | ROOF NAILING | EDURAZO | Approved | IVRS - Inspection :* |
| 07/19/2005 | EXT METAL CLIPS/EXT SHEATHING | EDURAZO | Approved | IVRS - Inspection :* |
| 08/01/2006 | STUCCO MESH | CRUIZ | Approved | IVRS - Inspection :* |
| 07/24/2007 | ELECTRIC - INTERMEDIATE | EDURAZO | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) CHECK C.P. ON N. SIDE 2) C.P. TO BE REMOVED PRIOR TO FINAL |
| 07/07/2010 | PLUMBING - ABOVE CEILING | RCAMACHO | Approved | IVRS - Inspection :* 1) OWNER TO KEEP ACTIVE PROGRESS |
| 12/28/2011 | PLUMBING - INTERMEDIATE | RCAMACHO | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE WATER TEST DWV AND POTABLE 2) PROVIDE TRAPS PER CODE 3) SECURE COPPER TO CODE 4) NAIL PROTECT PLUMBING THROUGHOUT 5) CLEANOUT KITCHEN SINK 6) STOPPED INSPECTION |
| 11/26/2013 | PLUMBING - GAS PRESSURE TEST | RCANCINO | Approved | |
| 09/30/2015 | SHEET ROCK NAILING | BBENEDOI | Approved | IVRS - Inspection :* |
| 02/29/2016 | U VALUE FOR WINDOW | RCAMACHO | Approved | IVRS - Inspection :* |
| 08/19/2016 | PLUMBING - YARD WTR LINE/TEST | ESTEVEN1 | Approved | IVRS - Inspection :* |
| 08/08/2017 | OUTDOOR LIGHTING FINAL | CAMACHO | Approved | INCR |
| 12/27/2018 | PLUMBING - GAS PRESS TEST FNL | MHASSAN | Approved | gas piping outside has already been approved and tested previously. In order to get gas clearance appliances need to be installed, water heater needs to be installed, current water heater location is not per drawing |
| 12/27/2018 | MECHANICAL - INTERMEDIATE | MHASSAN | Approved | return air is not set up per drawing. Either revise or build per drawing |
| 12/27/2018 | BUILDING - PROGRESS | MHASSAN | Approved | |
| 06/24/2019 | GAS CLEARANCE | MHASSAN | Approved | |
| 11/20/2019 | MECHANICAL - FINAL | JCLAXTON | Approved | |
| 11/20/2019 | PLUMBING - FINAL | JCLAXTON | Approved | |
| 11/20/2019 | PLUMBING - SEWER HCS CONNECT | JCLAXTON | Approved | |
| 11/20/2019 | ELECTRIC - FINAL | JCLAXTON | Approved | |
| 11/20/2019 | BUILDING - FINAL | JCLAXTON | Approved |