Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address NEW:
8445 E TANQUE VERDE RD
Apply Date:
11/10/2004
Applicant:
N/A
Description:
GRADING:
Contractors:
  • DIVERSIFIED DESIGN AND CONSTRUCT

Permit Reviews

Permit Number - T04BU02768
Permit Status: Final
Permit Description: GRADING:
Start Date Submittal Complete Date Status  
01/27/2006 REVISION - GRADING 02/02/2006 COMPLETED Review Details
11/10/2004 PLANS OK TO SUBMIT - GRADING 11/10/2004 COMPLETED Review Details
11/10/2004 GRADING 12/06/2004 COMPLETED Review Details
12/10/2004 RESUBMITTAL - GRADING ALL 12/20/2004 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T04BU02768
Permit Status: Final
Permit Description: GRADING:
Total Outstanding Activity Conditions - 1
Date Name
11/10/2004 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T04BU02768
Permit Description: GRADING:
Total Completed Inspections - 8
Date Description Inspector Results Comments
01/24/2005 ENGINEERING PRE-CONSTRUCTION JBRUCKME Approved THIS SITE HAS ALREADY BEEN GRUBBED AND GRADED. NO CONTROLS HAVE BEEN INSTALLED.
I MET WITH THE SUPERINTENDENTS FOR DIVERSIFIED AND MAGNUM TO REVIEW SWPPP.
1. POST SIGN AND INSTALL CONTROLS.
2. OBTAIN NOI AND AZPDES #.
03/30/2005 STORMWATER INSTALL OF CONTROLS JBRUCKME Approved
09/01/2005 STORMWATER FOLLOW-UP INSP JBRUCKME Approved SITE WORK IS COMPLETE, NO STORMWATER CONCERNS
09/01/2005 STORMWATER FINAL INSPECTION JBRUCKME Approved
11/18/2005 LANDSCAPE INSPECTION ACONNOR Approved Hydroseeding must be established for approval per DS 9-06.

Monitoring report requested for NPPO
11/29/2005 GRADING - FINAL JBRUCKME Approved 1. SUBMIT A REVISED GRADING PLAN TO THE CITY OF TUCSON DEVELOPMENT SERVICES, ENGINEERING AND ZONING DIVISIONS FOR REVIEW AND APPROVAL. SHOW AS-BUILT ELEVATIONS FOR MODULAR BUILDINGS AND MODIFICATIONS TO THE 6' LOW FLOW PIPES IN THE RETENTION BASIN AND THE SIDEWALK SCUPPER IN THE RIGHT OF WAY.
2. PROVIDE AN ENGINEER'S CERTIFICATION LETTER FOR THE RETENTION/DETENTION BASIN THAT INCLUDES INFILTRATION/PERCOLATION INFORMATION.
3. PROVIDE A 5' PAVED ACCESS WALKWAY TO CONNECT TO THE NEW CONCRETE SIDEWALK INT THE R.O.W. AT THE SOUTHEAST CORNER OF THE PROPERTY. SEE KEYNOTE #35 PAGE C.I.O..
03/08/2006 NPPO PRE PERMIT INSPECTION ACONNOR Approved
09/15/2006 PERMIT FINALED LJACKSON Approved

Documents

File Name Document Type  
DRAINAGERPT.TIF DOCUMENTS VIEW
GEOTECHEVAL.TIF DOCUMENTS VIEW
INFILTROMETERTEST.TIF DOCUMENTS VIEW
STORMWATERPPP.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW