Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T04BU02640
Permit Details
Apply Date:
10/28/2004
Applicant:
N/A
Description:
GRADING:110,296CY CUT 130,036CY FILL
Contractors:
- BORDERLAND CONSTRUCTION COMPANY *C
Permit Reviews
Permit Number - T04BU02640
Permit Status: Final
Permit Description: GRADING:110,296CY CUT 130,036CY FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/19/2005 | RESUBMITTAL - GRADING | 02/04/2005 | COMPLETED |
| 10/28/2004 | PLANS OK TO SUBMIT - GRADING | 10/28/2004 | COMPLETED |
| 10/28/2004 | GRADING | 11/22/2004 | COMPLETED |
| 12/14/2004 | RESUBMITTAL - GRADING ALL | 01/19/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU02640
Permit Status: Final
Permit Description: GRADING:110,296CY CUT 130,036CY FILL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/28/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04BU02640
Permit Description: GRADING:110,296CY CUT 130,036CY FILL
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2005 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
| 11/15/2007 | STORMWATER FOLLOW-UP INSP | NKALAHAR | Approved | LENNAR SITE IS ALMOST BUILT OUT NO STORMWATER CONCERNS AT THIS TIME |
| 11/15/2007 | STORMWATER FOLLOW-UP INSP | NKALAHAR | Approved | TJ BEDNAR V-DITCH HAS BEEN PLACED AT ALL LOTS BASINS STILL APPEAR NOT TO HAVE BEEN ADDRESSED |
| 12/10/2007 | GRADING - INTERMEDIATE | NKALAHAR | Approved | STANDING WATER PICTURES 2874-2879 |
| 12/19/2007 | LANDSCAPE INSPECTION | ACONNOR | Approved | Verify that all of Engineering comments and concerns are addressed. Monitoring report requested as to disposition of disposition of PIP, TOS, and required mitigation, as shown in the NPPO summary. |
| 08/29/2008 | GRADING - FINAL | NKALAHAR | Approved | STANDING WATER IN BASINS SEE PICS 3282-3287 |
| 10/02/2008 | STORMWATER INSTALL OF CONTROLS | DROBERTS | Approved | |
| 10/02/2008 | ENGINEERING PRE-CONSTRUCTION | DROBERTS | Approved | |
| 12/17/2008 | STORMWATER FINAL INSPECTION | DROBERTS | Approved | |
| 07/07/2009 | PERMIT FINALED | LJACKSON | Approved |