Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address NEW:
7250 E VOYAGER RD
Apply Date:
09/20/2004
Applicant:
STANTEC / WARREN THOMPSON
Description:
GRADING:83,410 CY FILL 15,755 CY VLG 6 LOTS 1-81 LENNAR
Contractors:
  • STANTEC
  • U S HOME OF ARIZONA *P *C

Permit Reviews

Permit Number - T04BU02323
Permit Status: Final
Permit Description: GRADING:83,410 CY FILL 15,755 CY VLG 6 LOTS 1-81 LENNAR
Start Date Submittal Complete Date Status  
09/20/2004 PLANS OK TO SUBMIT - GRADING 09/20/2004 COMPLETED Review Details
09/21/2004 GRADING 10/22/2004 COMPLETED Review Details
11/24/2004 RESUBMITTAL - GRADING ALL 04/21/2005 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T04BU02323
Permit Status: Final
Permit Description: GRADING:83,410 CY FILL 15,755 CY VLG 6 LOTS 1-81 LENNAR
Total Outstanding Activity Conditions - 1
Date Name
09/20/2004 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T04BU02323
Permit Description: GRADING:83,410 CY FILL 15,755 CY VLG 6 LOTS 1-81 LENNAR
Total Completed Inspections - 7
Date Description Inspector Results Comments
03/15/2005 NPPO PRE PERMIT INSPECTION ACONNOR Approved
12/19/2005 STORMWATER FOLLOW-UP INSP NKALAHAR Approved CULVERT OVER NORTH FORK AIRPORT WASH STILL BEING BUILT
FORM RELEASE @ BRIDGE HAS NO SECONDARY CONTAINMENT
11/23/2007 LANDSCAPE INSPECTION ACONNOR Approved Verify that all of Engineering comments and concerns are addressed.

Monitoring report requested as to disposition of disposition of PIP, TOS, and required mitigation, as shown in the NPPO summary.
12/21/2007 GRADING - FINAL NKALAHAR Approved MET ONSITE WITH DAVE, NICOLE AND SEAN

DISCUSSED DEFICIENCIES INCLUDING BASINS HOLDING WATER, EROSION AND GENERAL CLEAN UP

STABILIZATION FOR UNCOMPLETED PADS MUST BE WORKED OUT WITH EOR AND CITY REVIEW ENGINEER
03/31/2011 STORMWATER INSTALL OF CONTROLS DROBERTS Approved
03/31/2011 ENGINEERING PRE-CONSTRUCTION DROBERTS Approved
05/05/2020 STORMWATER FINAL INSPECTION DROBERTS Approved

Documents

File Name Document Type  
BONDRELESAE.TIF DOCUMENTS VIEW
PERFORMANCE BOND RELEASE 2012_08_15.PDF DOCUMENTS VIEW