Permit: T04BU02323
Permit Details
Apply Date:
09/20/2004
Applicant:
STANTEC / WARREN THOMPSON
Description:
GRADING:83,410 CY FILL 15,755 CY VLG 6 LOTS 1-81 LENNAR
Contractors:
- STANTEC
- U S HOME OF ARIZONA *P *C
Permit Reviews
Permit Number - T04BU02323
Permit Status: Final
Permit Description: GRADING:83,410 CY FILL 15,755 CY
VLG 6 LOTS 1-81 LENNAR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/20/2004 | PLANS OK TO SUBMIT - GRADING | 09/20/2004 | COMPLETED |
| 09/21/2004 | GRADING | 10/22/2004 | COMPLETED |
| 11/24/2004 | RESUBMITTAL - GRADING ALL | 04/21/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU02323
Permit Status: Final
Permit Description: GRADING:83,410 CY FILL 15,755 CY
VLG 6 LOTS 1-81 LENNAR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/20/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04BU02323
Permit Description: GRADING:83,410 CY FILL 15,755 CY
VLG 6 LOTS 1-81 LENNAR
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/15/2005 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
| 12/19/2005 | STORMWATER FOLLOW-UP INSP | NKALAHAR | Approved | CULVERT OVER NORTH FORK AIRPORT WASH STILL BEING BUILT FORM RELEASE @ BRIDGE HAS NO SECONDARY CONTAINMENT |
| 11/23/2007 | LANDSCAPE INSPECTION | ACONNOR | Approved | Verify that all of Engineering comments and concerns are addressed. Monitoring report requested as to disposition of disposition of PIP, TOS, and required mitigation, as shown in the NPPO summary. |
| 12/21/2007 | GRADING - FINAL | NKALAHAR | Approved | MET ONSITE WITH DAVE, NICOLE AND SEAN DISCUSSED DEFICIENCIES INCLUDING BASINS HOLDING WATER, EROSION AND GENERAL CLEAN UP STABILIZATION FOR UNCOMPLETED PADS MUST BE WORKED OUT WITH EOR AND CITY REVIEW ENGINEER |
| 03/31/2011 | STORMWATER INSTALL OF CONTROLS | DROBERTS | Approved | |
| 03/31/2011 | ENGINEERING PRE-CONSTRUCTION | DROBERTS | Approved | |
| 05/05/2020 | STORMWATER FINAL INSPECTION | DROBERTS | Approved |