Permit: T04BU02323


Addresses:

7250 E VOYAGER RD


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T04BU02323

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
05/05/2020 STORMWATER FOLLOW-UP INSP Approved
03/31/2011 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME, ALL SITE WORK IS BEING COMPLETED WITHIN THE GENERAL GUIDELINES.
03/06/2009 STORMWATER FOLLOW-UP INSP Partial Approval 3 NEW STARTS
NO STORMWATER CONCERNS AT THIS TIME
SITE APPEARS TO BE MAINTAINED
10/03/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
NO CHANGE IN SITE
08/13/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO CHANGE IN SITE
NO STORMWATER CONCERNS
07/10/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
05/08/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
03/17/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
03/06/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO NEW STARTS
NO STORMWATER CONCERNS
11/09/2007 STORMWATER FOLLOW-UP INSP Correction Required WASH OUT NEEDS TO BE BERMED UP
10/01/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
09/13/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
07/12/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
06/26/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
SWEEP THE S END OF SWEET SPRING
05/22/2007 STORMWATER FOLLOW-UP INSP Correction Required DELIVERED 5/17 INSPECTION TO WARREN
05/17/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
PICS 2289-2290
-CLEAN UP WASH OUT FROM ROADWAY IN FRONT OF LOT 6055
03/21/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
01/31/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
-SWEEP STREETS IN FRONT OF ALL ACTIVE LOTS
01/10/2007 STORMWATER FOLLOW-UP INSP Partial Approval HAND DELIVERED PPW
01/09/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 7 DAYS
-LOT 24 CONCRETE WASHED OUT ON LOT
-PLACE CURBSIDE BMPS AT STOCKPILES LOT 20-22
11/27/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
-CLEAN UP CONCRETE WASHOUT IN ASPHALT E END OF JACK OAK
-SWEEP IN FRONT OF ACTIVE LOTS
10/17/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 7 DAYS

-CONCRETE WASHED OUT IN STREET LOT 33-32 DC CONCRETE ON SITE
-CONCRETE WASHED OUT IN STREET LOT 30
-UNCONTAINED CONSTRUCTION DEBRIS LOT 25
06/20/2006 STORMWATER FOLLOW-UP INSP Correction Required -NEED S.C.E. WHERE EAGLE ROCK (ET AL) ARE USING WATER HYDRANT TO FILL WATER TRUCKS
-STREETS NEED TO BE SWEPT
-WALL OPENINGS NEED TO BE PROTECTED ALONG WEST SIDE OF PROJECT
04/03/2006 STORMWATER FOLLOW-UP INSP Partial Approval PAVING WORK CONTINUING
NO CONCERNS AT THIS TIME
02/28/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
02/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
01/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
12/19/2005 STORMWATER FOLLOW-UP INSP Partial Approval CULVERT OVER NORTH FORK AIRPORT WASH STILL BEING BUILT
FORM RELEASE @ BRIDGE HAS NO SECONDARY CONTAINMENT
11/18/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS AT THIS TIME
ALL SWPPP IN PLACE AND APPEAR TO BE WORKING
MET WITH DAN MATTAUSCH 730-9447
SWPPP POSTING AT WEST SCE
DAN WILL CHECK ON SECONDARY CONTAINMENT FOR FORM RELEASE BEING USED ON BOX CULVERT OVER THE PANTANO WASH
05/13/2005 STORMWATER FOLLOW-UP INSP Partial Approval