Permit: T04BU02322
Permit Details
Apply Date:
09/20/2004
Applicant:
STANTEC /WARREN THOMPSON
Description:
GRADING: CUT 169,490 CY FILL 64,650 CY VLG 5 LOTS 1-219 RICHMOND AMERICAN
Contractors:
- STANTEC
Permit Reviews
Permit Number - T04BU02322
Permit Status: Final
Permit Description: GRADING: CUT 169,490 CY FILL 64,650 CY
VLG 5 LOTS 1-219 RICHMOND AMERICAN
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/07/2005 | RESUBMITTAL - GRADING | 03/11/2005 | COMPLETED |
| 09/20/2004 | PLANS OK TO SUBMIT - GRADING | 09/20/2004 | COMPLETED |
| 09/21/2004 | GRADING | 10/22/2004 | COMPLETED |
| 11/24/2004 | RESUBMITTAL - GRADING ALL | 01/07/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU02322
Permit Status: Final
Permit Description: GRADING: CUT 169,490 CY FILL 64,650 CY
VLG 5 LOTS 1-219 RICHMOND AMERICAN
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/20/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04BU02322
Permit Description: GRADING: CUT 169,490 CY FILL 64,650 CY
VLG 5 LOTS 1-219 RICHMOND AMERICAN
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/15/2005 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
| 01/25/2006 | ENGINEERING PRE-CONSTRUCTION | NKALAHAR | Approved | MET WITH LUIS VASQUEZ ON SITE (471-2344) AND COVERED PRECON FORM. COPY IN FILE JASON SALINE WILL BE SWPPP CONTACT FOR RICHMOND AMERICAN 904-5518 |
| 11/02/2007 | GRADING - FINAL | DROBERTS | Approved | THIS INSPECTION IS NOT TO BE CONSIDERED A PORTION OF THE GRADING INSPECTION FOR THIS CURRENT PERMIT. THE INFORMATION PROVIDED HERE IS TO BE UTILIZED SOLELY FOR THE REDUCTION OF THE GRADING RESEEDING BOND THAT HAS BEEN POSTED FOR THIS SITE. CURRENTLY THE SITE IS APPROXIMATELY 68% COMPLETE AT THIS TIME, LEAVING 32% OF UNDEVELOPED LOTS. THE MINIMAL AMOUNT OF THE GRADING RESEEDING BOND THAT WILL BE REQUIRED TO BE LEFT IN PLACE WILL BE ATLEAST 50% OF THE CURRENT BOND. THE SITE WILL NEED TO HAVE A FINAL GRADING INSPECTION COMPLETED TO VERIFY IF THERE ARE ANY OTHER ITEMS THAT NEED TO BE ADDRESSED PRIOR TO TURNING THE SITE OVER TO ANOTHER DEVELOPER. SEE THE INSPECTION RESULTS IN SUBDIVISION FILE S04-080 FOR THE ITEMS THAT REMAIN INCOMPLETE AT THIS TIME FOR THE RELEASE OF THE ASSURANCES. |
| 12/06/2007 | GRADING - INTERMEDIATE | NKALAHAR | Approved | GRADE BEHIND ROW OF LOTS INCLUDING LOT 16 NEEDS TO BE RE-ESTABLISHED FOR POSITIVE DRAINAGE FOR B TYPE LOTS MET WITH BILL TERRELL AND MALENA C ON SITE |
| 12/21/2007 | STORMWATER FOLLOW-UP INSP | NKALAHAR | Approved | TRACK OUT CALLED JASON SALINE AND ADVISED |
| 04/18/2011 | LANDSCAPE INSPECTION | DROBERTS | Approved | |
| 04/18/2011 | STORMWATER INSTALL OF CONTROLS | DROBERTS | Approved | |
| 06/14/2011 | PERMIT FINALED | KMEDINA | Approved |