Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T04BU02322
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2011 | GRADING - INTERMEDIATE | Approved | ||
| 03/06/2009 | GRADING - INTERMEDIATE | Partial Approval | 3 NEW STARTS NO STORMWATER CONCERNS-DEBRIS APPEARS TO BE CONTAINED NO VISIBLE WASHOUT |
|
| 03/17/2008 | GRADING - INTERMEDIATE | Partial Approval | GRADE ISSUES ADDRESSED IN BASIN NO PONDING WATER AFTER SMALL RAIN EVENT 3/16 | |
| 12/06/2007 | GRADING - INTERMEDIATE | Correction Required | GRADE BEHIND ROW OF LOTS INCLUDING LOT 16 NEEDS TO BE RE-ESTABLISHED FOR POSITIVE DRAINAGE FOR B TYPE LOTS MET WITH BILL TERRELL AND MALENA C ON SITE |
|
| 05/10/2007 | GRADING - INTERMEDIATE | Partial Approval | TALKED TO RICK DOJAQUEZ WITH BORDERLAND THE IMPROVEMENTS IN THE NORTH FORK WASH WERE DONE AS PART OF A PIA BORDERLAND DID ALL THE WORK UP TO AND INCLUDING THE STABILIZED PATHWAY AT THE PL FOR VILLAGE 5 |
|
| 05/09/2007 | GRADING - INTERMEDIATE | Partial Approval | WALKED COMMON AREA A AND LOOKED AT IMPROVEMENTS TO THE NORTH FORK WASH. THE GRADING PLANS FOR VILLAGE 5 DO NOT SPECIFICALLY ADDRESS THE IMPROVEMENTS IN THE WASH. I HAVE CONTACTED RICK DOJAQUEZ WITH BORDERLAND TO ASK ABOUT THOSE SPECIFIC IMPROVEMENTS. THERE ARE SOME CONCERNS WITH COMMON AREA A- IT DOES NOT APPEAR TO BE BUILT TO PLAN-FLOW APPEARS DIFFERENT AND DG WALKWAYS HAVE ERODED OUT AND LEFT DEPOSITS IN BASIN FLOOR. THERE IS EVIDENCE OF STANDING WATER AS WELL |
|
| 04/19/2007 | GRADING - INTERMEDIATE | Partial Approval | MET WITH CRAIG DAWSON AND JASON SALINE ON SITE TO DISCUSS FINAL GRADING, STABILIZATION, SCOPE OF WORK |