Permit: T04BU02119
Permit Details
Apply Date:
08/25/2004
Applicant:
TRIUMPH BUILDERS SOUTHWEST LLC *C*
Description:
GRADING:
Contractors:
- TRIUMPH BUILDERS SOUTHWEST LLC *C*
Permit Reviews
Permit Number - T04BU02119
Permit Status: Final
Permit Description: GRADING:
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/25/2004 | PLANS OK TO SUBMIT - GRADING | 08/31/2004 | COMPLETED |
08/31/2004 | GRADING | 09/10/2004 | COMPLETED |
09/10/2004 | RESUBMITTAL - GRADING | 09/14/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU02119
Permit Status: Final
Permit Description: GRADING:
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
08/25/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04BU02119
Permit Description: GRADING:
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/15/2004 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
10/01/2004 | ENGINEERING PRE-CONSTRUCTION | JSALINE | Approved | NO ACTIVITY AT THIS SITE AT THIS TIME. RE-SHCEDULE FOR THE END OF THE MONTH. |
12/23/2004 | STORMWATER INSTALL OF CONTROLS | JSALINE | Approved | NO STORM WATER CONCERNS AT THIS TIME. CONTRACTOR, (CLIFF), WITH TRIUMPH HAS CALLED THIS INSPECTION IN FOR THE UNDERGROUND RETENTION BASINS. PARTIAL APPROVAL HAS BEEN GRANTED AND THE CONTRACTOR WILL CALL FOR ANOHTER INSPECTION PRIOR TO BACKFILLING THE UNDERGROUND RETENTION BASINS. |
12/28/2004 | STORMWATER FOLLOW-UP INSP | JSALINE | Approved | BACK FILLING OF UNDERGROUND DETENTION BASINS IS SATISFACTORY PER DEVELOPMENT PLANS. RE-INSPECTION WILL OCCUR FOR INSTALLATION OF THE INLETS. ALSO REQUESTED TO HAVE STRAW WADDLE REPLACED INFRONT OF EXISTING CATCH BASIN. WADDLE WAS REPLACED ONSITE DURING VISIT. |
09/09/2005 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | |
09/26/2005 | GRADING - INTERMEDIATE | MRUSSO | Approved | FOLLOW-UP INSPECTION ACCOMPLISHED, SITE SUPERINTENDENT WORKING ON ESTABLISHED PUNCH LIST ITEMS. SITE WORK STILL NOT COMPLETED. |
12/19/2005 | GRADING - FINAL | MRUSSO | Approved | 1) CLEAN AND/OR REMOVE SPOILS FROM AREA AROUND THE NEW DRAINAGE APRON LOCATED ON NW CORNER OF PROPERTY. 2) REMOVE FORMS AND REBAR FROM NEW SECTION OF SIDEWALK ON EAST SIDE OF COMPLEX. 3) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE RET/DET BASINS IN SITE WERE BUILT IN ACCORDANCE WITH THE APPROVED PLANS. |
07/13/2006 | PERMIT FINALED | LJACKSON | Approved |