Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2005 | STORMWATER INSTALL OF CONTROLS | Approved | ||
| 12/23/2004 | STORMWATER INSTALL OF CONTROLS | Partial Approval | NO STORM WATER CONCERNS AT THIS TIME. CONTRACTOR, (CLIFF), WITH TRIUMPH HAS CALLED THIS INSPECTION IN FOR THE UNDERGROUND RETENTION BASINS. PARTIAL APPROVAL HAS BEEN GRANTED AND THE CONTRACTOR WILL CALL FOR ANOHTER INSPECTION PRIOR TO BACKFILLING THE UNDERGROUND RETENTION BASINS. |
|
| 10/25/2004 | STORMWATER INSTALL OF CONTROLS | Not ready for Inspection | NO ACTIVITY AT THIS SITE AT THIS TIME. |