Permit: T04BU00133
Permit Details
Apply Date:
01/20/2004
Applicant:
N/A
Description:
GRADING:29147 CY CUT & 13463 CY FILL
Contractors:
- O LEARY CONSTRUCTION INC ,
Permit Reviews
Permit Number - T04BU00133
Permit Status: Si_xpire
Permit Description: GRADING:29147 CY CUT & 13463 CY FILL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/20/2004 | PLANS OK TO SUBMIT - GRADING | 01/20/2004 | COMPLETED |
01/20/2004 | GRADING | 03/24/2004 | COMPLETED |
04/20/2004 | RESUBMITTAL - GRADING ALL | 05/20/2004 | COMPLETED |
06/01/2004 | RESUBMITTAL - GRADING | 06/21/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU00133
Permit Status: Si_xpire
Permit Description: GRADING:29147 CY CUT & 13463 CY FILL
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
01/20/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
06/15/2004 | ALTHOUGH THE BRITANNIA RIGHT-OF-WAY IS EXPECTED TO BE ABANDONED AT FINAL PLATTING, ESTABLISHMENT OF EASEMENTS AND ABANDONMENTS ARE RESPONSIBILITY OF OWNER. |
06/15/2004 | INFILTRATION TEST RESULTS MAY BE REQUIRED AT TIME OF BASIN COMPLETION, AFTER 90% GRADING CONSTRUCTION IS COMPLETED AND BEFORE FINAL RELEASE OF ASSURANCES. FINAL ASSURANCES SHALL BE HELD UNTIL FUNCTION OF BASINS ARE DETERMINED TO MEET DESIGN REQUIREMENTS AS SPECIFIED PER THE APPROVED GRADING PLAN AND ASSOCIATED DRAINAGE AND GEOTECHNICAL REPORTS. |
06/16/2004 | Currently, reseed bond posted under T04BU00133 covers reseed/erosion protection for Phase 2. |
06/16/2004 | THIS PERMIT IS FOR GRADING CONSTRUCTION FOR PHASE 2 GRADING ONLY. |
06/16/2004 | |
06/16/2004 | SEE GEOTECHNICAL CLARIFICATION DATED APRIL 26, 2004 FROM PATTISON EVANOFF REGARDING SETBACKS, MINIMUM PERCENT SLOPE GRADES AND OTHER GEOTECHNICAL RECOMMENDATIONS. |
Completed Inspections
Permit Status: Si_xpire
Permit Number: T04BU00133
Permit Description: GRADING:29147 CY CUT & 13463 CY FILL
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/03/2004 | ENGINEERING PRE-CONSTRUCTION | JSALINE | Approved | JAY KNOLL CALLED AND HAS EXPRESSED A SWIFT REMOVAL OF THE STOCK PILE ON SITE. THE REMAINING PORTION OF THE PROJECT HAS HAD THE APPROPRIATE SWPPP CONTROLS INSTALLED AND WORKING PROPERLY. SITE WILL BE RE-INSPECTED IN TWO WEEKS. |
08/12/2004 | STORMWATER INSTALL OF CONTROLS | JSALINE | Approved | SWPPP CONTROLS FOR THE STOCK PILE ONLY HAVE BEEN REMOVED PERMINENTLY. THE STOCK PILE HAS BEEN REMOVED AND HAULED AWAY. THERE ARE NO OTHER STORM WATER CONCERNS AT THIS TIME. |
12/15/2008 | GRADING - FINAL | MAVERY | Approved | Spoke to Brian, Desert Earth got the OK to start. Asked Brian to call when work starts. |
01/29/2009 | LANDSCAPE INSPECTION | ACONNOR | Approved | |
03/11/2009 | PERMIT FINALED | KMEDINA | Approved |