Permit: T04BU00133


Addresses:

6300 S ALVERNON WY

Inspection Status: Approved

Inspection History: ENGINEERING PRE-CONSTRUCTION

Date Description Inspector Results Comments
03/10/2009 ENGINEERING PRE-CONSTRUCTION Approved Completed
08/03/2004 ENGINEERING PRE-CONSTRUCTION Partial Approval JAY KNOLL CALLED AND HAS EXPRESSED A SWIFT REMOVAL OF THE STOCK PILE ON SITE. THE REMAINING PORTION OF THE PROJECT HAS HAD THE APPROPRIATE SWPPP CONTROLS INSTALLED AND WORKING PROPERLY. SITE WILL BE RE-INSPECTED IN TWO WEEKS.
06/21/2004 ENGINEERING PRE-CONSTRUCTION Not ready for Inspection Construction on phase 2 of this project has not yet begun. Some of the controls are being installed but more are needed. A re-inspection will commence on July, 14th.