Permit: T03CM01962
Permit Details
Apply Date:
04/22/2003
Applicant:
FAZIO BY DESIGN
Description:
SFR:TD#15-70-58
Contractors:
- FAZIO BY DESIGN
Permit Reviews
Permit Number - T03CM01962
Permit Status: C of o
Permit Description: SFR:TD#15-70-58
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/05/2003 | RESIDENTIAL BLDG/ENGINE/WALK THRU | 06/05/2003 | COMPLETED |
| 07/14/2003 | REVISION | 07/15/2003 | COMPLETED |
| 07/30/2003 | REVISION | 07/30/2003 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T03CM01962
Permit Status: C of o
Permit Description: SFR:TD#15-70-58
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/22/2003 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T03CM01962
Permit Description: SFR:TD#15-70-58
Total Completed Inspections - 27
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2003 | ELECTRIC - UFER | EDURAZO | Approved | IVRS - Inspection 0000* |
| 06/12/2003 | BUILDING PRE-SLAB | EDURAZO | Approved | IVRS - Inspection 0000* |
| 06/12/2003 | STEM WALL/RETAINING WALL | EDURAZO | Approved | IVRS - Inspection 0000* |
| 06/12/2003 | EXCAVATION/LAYOUT REBAR & ZON | EDURAZO | Approved | IVRS - Inspection 0000* |
| 07/17/2003 | ELECTRIC - TEMPORARY SERVICE | HPEDROZA | Approved | IVRS - Inspection 0000*SENT TO TEP ON 7/18AM |
| 07/17/2003 | ELECTRIC - CABLE DROP | HPEDROZA | Approved | IVRS - Inspection 0000*SENT TO TEP ON 7/18AM |
| 07/17/2003 | ROOF NAILING | HPEDROZA | Approved | IVRS - Inspection 0000* |
| 07/17/2003 | EXT METAL CLIPS/EXT SHEATHING | HPEDROZA | Approved | IVRS - Inspection 0000* |
| 08/04/2003 | MECHANICAL - INTERMEDIATE | HPEDROZA | Approved | IVRS - Inspection 0000* |
| 08/04/2003 | PLUMBING - INTERMEDIATE | HPEDROZA | Approved | IVRS - Inspection 0000* |
| 08/04/2003 | ELECTRIC - INTERMEDIATE | HPEDROZA | Approved | IVRS - Inspection 0000* |
| 08/04/2003 | STUCCO MESH | HPEDROZA | Approved | IVRS - Inspection 0000* |
| 08/04/2003 | FRAMING | HPEDROZA | Approved | IVRS - Inspection 0000* |
| 08/11/2003 | SHEET ROCK NAILING | FGREER | Approved | IVRS - Inspection 0000* |
| 10/01/2003 | PLUMBING - SEWER HCS CONNECT | JRIVA | Approved | IVRS - Inspection 0000* |
| 10/01/2003 | PLUMBING - YARD WTR LINE/TEST | JRIVA | Approved | IVRS - Inspection 0000* |
| 10/01/2003 | PLUMBING - ROUGH, SOIL | JRIVA | Approved | |
| 10/21/2003 | PERMIT FINALED | HCAMPBEL | Approved | |
| 10/21/2003 | MECHANICAL - FINAL | HCAMPBEL | Approved | IVRS - Inspection 0000* |
| 10/21/2003 | MECHANICAL - FINAL | HCAMPBEL | Approved | IVRS - Inspection 0999* |
| 10/21/2003 | PLUMBING - FINAL | HCAMPBEL | Approved | IVRS - Inspection 0000* |
| 10/21/2003 | PLUMBING - FINAL | HCAMPBEL | Approved | IVRS - Inspection 0999* |
| 10/21/2003 | ELECTRIC - FINAL | HCAMPBEL | Approved | IVRS - Inspection 0000* |
| 10/21/2003 | ELECTRIC - FINAL | HCAMPBEL | Approved | IVRS - Inspection 0999* |
| 10/21/2003 | BUILDING - FINAL | HCAMPBEL | Approved | IVRS - Inspection 0000* |
| 10/21/2003 | BUILDING - FINAL | HCAMPBEL | Approved | IVRS - Inspection 0999*/ 1) INSTALL TWO SELF CLOSING HINGES ON GARAGE DOOR TO HOUSE 2) FULL 3' LANDING REQUIRED AT WALK THROUGH ON EXTERIOR 3) SUPPORT FLEX AT A/C HACR WITHIN 12" OF BOX 4) EXPOSED ELECTRIC AT MBR LID, OTHER BEDROOMS 5) INSTALL ATI-TIP AT RANGE 6) NEED ATTIC ACCESS 7) NOTES: PROVIDE GRADING PLAN AT NEXT INSPECTION 8) PROVIDE ATTIC ACCESS AT NEXT INSPECTION |
| 10/21/2003 | U VALUE FOR WINDOW | HCAMPBEL | Approved |