Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T02EL02203
Permit Details
Apply Date:
11/12/2002
Applicant:
ESSNER ELECTRIC
Description:
UPGRADE:ELECTRIC 60AMP TO 100AMP
Contractors:
- ESSNER ELECTRIC
Permit Reviews
Permit Number - T02EL02203
Permit Status: Final
Permit Description: UPGRADE:ELECTRIC 60AMP TO 100AMP
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/12/2002 | ELECTRICAL | 11/12/2002 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T02EL02203
Permit Status: Final
Permit Description: UPGRADE:ELECTRIC 60AMP TO 100AMP
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
11/12/2002 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T02EL02203
Permit Description: UPGRADE:ELECTRIC 60AMP TO 100AMP
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/13/2002 | ELECTRIC - FINAL | MCAPISTR | Approved | IVRS - Inspection 0215* 1.) PERMANENT ADDRESS LABEL REQUIRED BELOW METER. DO NOT USE "MAGIC MARKER" PEN, OR PENCIL 2.) YOU MUST INSTALL TWO (2) GROUND RODS. SET THEM 6' MINIMUM APART AND SINK THEM 2" BELOW GROUND LEVEL. LEAVE ENDS EXPOSED FOR INSPECTION. 3.) SET THE GROUND CLAMPS AHEAD OF THE PIPE UNIONS ON " HOUSE SIDE". 4.) INSTALL A SECOND PIPE CLAMP ON RISER PIPE WITHIN 8" OF THE PANEL. USE MINIMUM 1/4" LAG BOLTS. |
11/13/2002 | ELECTRIC - SERVICE UPGRADE | MCAPISTR | Approved | IVRS - Inspection 0215* |
03/20/2003 | PERMIT FINALED | DSANTACR | Approved | |
03/20/2003 | ELECTRIC - TEMPORARY SERVICE | MCAPISTR | Approved | |
03/20/2003 | ELECTRIC - CABLE DROP | MCAPISTR | Approved |